

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Nilfisk Scrubber BA 531
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Recovery Water Tank and Vacuum Grid Cleaning
Drive the machine to the appointed recovery water disposal area
Turn off the machine
Lift the cover (A) to washing position (L)
Wash with clean water the cover (A), the tank (B) and the vacuum grid with automatic shut-off float (D)
Drain the water in the tank through the hose (16). If necessary, release the fasteners (E) and open the grid (D), recover the float (F), clean all the components and then reinstall them
Check the tank cover gasket (G) for integrity
Check that the bearing surface (J) of the gasket (G) is integral and adequate for the gasket itself
Check the compensation hole (K) for clogging, and clean it if necessary
Close the cover
1 Weekly Squeegee Blade Check and Replacement
1. Clean the steel squeegee (Fig. 1) or the aluminium squeegee (Fig. 2), according to the procedure shown in the previous paragraph
2. Check that the edges (E, Fig. 1 or 2) of the front blade (C) and the edges (F) of the rear blade (D) lay down on the same level, along their length; otherwise adjust their height according to the following procedure
• Release the tie rod (G, Fig. 1 or 2) and loosen the wing nuts (H, Fig. 1), or disengage the fasteners (M, Fig. 2) and adjust the rear blade (D, Fig. 1 or 2), then tighten the wing nuts, or engage the fasteners, and then engage the tie rod
• Loosen the handwheels (I) and adjust the front blade (C, Fig. 1 or 2); then tighten the handwheels
3. Check the front blade (C, Fig. 1 or 2) and rear blade (D) for integrity, cuts and tears; if necessary replace them according to the following procedure. Check that the front corner (J) of the rear blade is not worn; otherwise, overturn the blade to replace the worn corner with an integral one. If the other corners are worn too, replace the blade according to the following procedure
• Release the tie rod (G), remove the wing nuts (H) or disengage the fasteners (M), remove the retaining strip (K), then replace/overturn the rear blade (D). Then install the blade in the reverse order of removal
• Unscrew the handwheels (I) and remove the retaining strip (L), then replace the front blade (C). Install the blade in the reverse order of removal. After the blade replacement (or overturning), adjust the height as shown in the previous step
4. Connect the vacuum hose (15) to the squeegee
5. Install the squeegee (25) and screw down the handwheels (26)
1 Yearly Brush/Pad-Holder Motor Carbon Brush Maintenance
- BRUSH MOTOR CARBON BRUSH CHECK/REPLACEMENT(For BA 451, BA 451D, BA 531, BA 531D)
1. If the tank (21) contains recovery water
• Drive the machine to the appointed recovery water disposal area
• (For BA 451D, BA 531D) Turn the ignition key (80) to “0”
• (For BA 451, BA 531) Turn off the switches (71) and (73)
• Empty the recovery water tank (21) with the hose (16)
2. Drive the machine on a level floor
3. Remove the brush/pad-holder
4. Lower the deck by pressing the pedal (11)
Initial 8 Hours Screw and Nut Tightening Check
Drive the machine to the appointed disposal area, and empty the recovery water tank (21) with the hose (16)
Place the machine on a hoisting system (if available). Otherwise, drive the machine on a level floor
Turn off the machine
(For CA 451, CA 531, CA 551) Open the recovery water tank cover (22). Remove the retaining plate (61) of the tank (40)
Grasp the handle (41) and carefully lift the tank (40)
Check
Carefully lower the tank (40)
(For CA 451, CA 531, CA 551) Install the retaining plate (61)
WARNING! (For CA 451, CA 531, CA 551) When the maintenance/repair procedure is completed, the tank (40) must always be locked with the plate (61)
6 Monthly Screw and Nut Tightening Check
Drive the machine to the appointed disposal area
Empty the recovery water tank (21) with the hose (16)
Place the machine on a hoisting system (if available). Otherwise, drive the machine on a level floor
Turn off the machine
Open the recovery water tank cover (22). Remove the retaining plate (61) of the tank (40)
Grasp the handle (41) and carefully lift the tank (40)
Check
Carefully lower the tank (40)
Install the retaining plate (61)
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













