MaintainX Asset Hub logo
EnterprisePricing
Mori Seiki

Mori Seiki CNC Vertical Machining Center MSD-680

Need answers fast?
Explore the manual using AI.

Mori Seiki CNC Vertical Machining Center MSD-680
Mori Seiki CNC Vertical Machining Center MSD-680

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Mori Seiki CNC Vertical Machining Center MSD-680

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Mori Seiki CNC Vertical Machining Center MSD-680

Mori Seiki CNC Vertical Machining Center MSD-680

Create an account to install this asset package.

Maintenance Plans for Mori Seiki CNC Vertical Machining Center Model MSD-680

Integrate maintenance plans directly into your work orders in MaintainX.

1000 Hourly / 6 Monthly Air Filter Element Inspection

Check mark

Warning: Ensure the power is turned off and the compressed air supply is shut off before starting the procedure.

Check mark

Power turned off?

Check mark

Compressed air supply shut off?

Check mark

Turn the case assembly (1) 45 degrees while pressing the lock button down.

Check mark

Case assembly turned 45 degrees?

Check mark

Loosen the baffle (2). The element (3) can be taken out of the case assembly.

Check mark

Baffle loosened and element taken out?

Check mark

Wash the element (3) using neutral detergent.

Check mark

Element washed with neutral detergent?

Run this procedureArrow right

1 Yearly Tank Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

Is the tank ready for cleaning?

Check mark

If tank is not ready for cleaning, report the issues to the maintenance team and stop the procedure

Check mark

Was the inside of the tank cleaned?

Check mark

Was the filter cleaned or replaced?

Check mark

Was washing oil used to clean the filter?

Check mark

Was compressed air applied to the filter?

Check mark

Was a thinner-based fluid used to clean the filter?

Check mark

Sign off on the tank maintenance

Run this procedureArrow right

Air Filter Element Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

Air filter element visually inspected?

Check mark

Air filter element clogged?

Check mark

If the air filter element is clogged, proceed to clean it.

Check mark

Air filter element cleaned?

Check mark

If the air filter element is heavily clogged or contaminated, or if the air cylinder fails to operate correctly due to loss of pressure, replace the filter element.

Check mark

Air filter element replaced?

Check mark

Sign off on the air filter element maintenance

Run this procedureArrow right

Air Filter Lubrication

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Is the air filter type AF4000?

Check mark

Enter the internal pressure inside the case

Check mark

Is the float 1 at the bottom?

Check mark

Is the valve 2 closing the slot in the chamber 3?

Check mark

Is the piston 4 forced down due to spring 5 force?

Check mark

Is the foreign matter entering the drain housing through the slot 3 in the chamber?

Check mark

When pressure is applied, does the piston 4 move up, overcoming the spring 5 force, to come into contact with the O-ring 6, enclosing the inside of case 7?

Check mark

When foreign matter accumulates inside the case, does the float 1 rise from buoyancy to open the slot in the chamber 3?

Run this procedureArrow right

Air Supply Check

Check mark

CAUTION: The compressed air must be clean and dry. Contaminated or humid air will extremely shorten the service life of air-operated component parts.

Check mark

Check the air pressure with the FRL unit air regulator pressure gage.

Check mark

If the pressure gage indication is not the specified value, adjust the source pressure to 0.5 MPa (71.1 psi).

Check mark

Check the tool unclamp unit charge tank pressure regulator.

Check mark

If the charge tank pressure is lower than 0.2 MPa (28.44 psi), the collet will fail to open fully and the tool cannot be unclamped completely. If the pressure is higher than 0.2 MPa (28.44 psi), the tool unclamp cylinder will fail to return to the clamp end position and the tool cannot be clamped completely.

Check mark

Check the air supply volume.

Check mark

The air supply volume must be greater than the specified value [100 L/min (26.4 gpm) (ANR*) for the standard specification machine]. A 1 HP compressor provides approximately 90 L/min (23.76 gpm) (ANR*).

Check mark

NOTE: *: ANR refers to a standard atmospheric state; i.e., temperature at 20C (68°F), absolute pressure at 101.3 kPa {760 mmHg), and relative humidity at 65%.

Check mark

Sign off on the air supply check

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Mori Seiki

Explore Other Assets