

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Migatronic Plasma Cutting Machine ZETA 40
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Water Separator Maintenance
Empty and Clean Water Separator
Choose method to empty the water separator
Was the water separator emptied successfully?
Clean the glass cap
Inspect and Clean Electrode and Nozzle
Check for issues
Is there moisture in the air?
Clean the end of the electrode with fine sandpaper
Clean the inside of the nozzle with fine sandpaper
Plasma Hose And Cutting Head Maintenance
Inspection
Examine the cutting head for damages.
Inspect the plasma hose for damages on the cover.
Nozzle Maintenance
Check the nozzle for metal spatter and clean with a wire brush.
Is the nozzle worn out and needs replacement?
Remove metal spatter between electrode and nozzle cap using compressed air.
Replacement
Replace parts if needed
1 Yearly Plasma Cutting Machine Maintenance
Water Separator Maintenance
Press the air escape valve to empty the water separator
Screw off the glass cap and clean it
Electrode and Nozzle Maintenance
Check for issues with electrode and nozzle
Clean the end of the electrode with fine sandpaper
Clean the inside of the nozzle with fine sandpaper
Air Pressure Adjustment
Machine Startup
Switch ON the machine
Air Pressure Adjustment
Push the “air test” button on the front panel
Check the air pressure on the gauge
Adjust the air pressure to 3.5 bar
Is the air pressure adjusted correctly?
Release the pushbutton
Flow Control
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













