MaintainX Asset Hub logo
EnterprisePricing
Loren Cook Company

Loren Cook Company AC Exhauster ACRU-HP

Need answers fast?
Explore the manual using AI.

Loren Cook Company AC Exhauster ACRU-HP
Loren Cook Company AC Exhauster ACRU-HP

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Loren Cook Company AC Exhauster ACRU-HP

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Loren Cook Company AC Exhauster ACRU-HP

Loren Cook Company AC Exhauster ACRU-HP

Create an account to install this asset package.

Maintenance Plans for Loren Cook Company AC Exhauster Model ACRU-HP

Integrate maintenance plans directly into your work orders in MaintainX.

3 Yearly Motor Bearings Lubrication

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Is the motor a Direct Drive 1050/1075,1200,1300 &1500 rpm unit?

Check mark

If yes, proceed with the following steps. If not, skip to step 7.

Check mark

Has the unit been stored for a year or more?

Check mark

Is the unit in severe conditions?

Check mark

Add LIGHT grade mineral oil or SAE 10W oil up to 30 drops.

Check mark

Does the motor have grease lubricated ball or roller bearings?

Check mark

If yes, proceed with the following steps. If not, skip to step 12.

Check mark

Are the bearings without provisions for relubrication?

Run this procedureArrow right

6 Monthly Fan Inspection

Check mark

It is recommended the following inspections be conducted twice per year.

Check mark

• Inspect bolts and setscrews for tightness. Tighten as necessary. Refer to Torque chart.

Check mark

• Inspect belt wear and alignment. Replace worn belts with new belts and adjust alignment as needed. Refer to Belt and Pulley Installation, page 4.

Check mark

• Bearings should be inspected as recommended in the Conditions Chart.

Check mark

• Inspect for cleanliness. Clean exterior surfaces only. Removing dust and grease on motor housing assures proper motor cooling.;

Run this procedureArrow right

Fan Bearing Replacement

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Old bearing removed

Check mark

Burrs removed from the shaft by sanding

Check mark

New bearings slid onto the shaft and loosely mounted onto the bearing support

Check mark

Wheel correctly positioned and bearing bolts securely tightened to the bearing support

Check mark

Setscrews aligned bearing to bearing and secured tightly to the shaft

Check mark

NOTICE! Never tighten both pairs of setscrews before securing bearing mounting bolts. This may damage the shaft.

Check mark

Wheel position inspected again

Check mark

Sign off on the fan bearing replacement

Run this procedureArrow right

Fan Bearings Lubrication

Check mark

NOTICE! The fan bearings are provided prelubricated. Any specialized lubrication instructions on fan labels supersedes information provided herein.

Check mark

Bearing grease is a petroleum lubricant in a lithium base conforming to a NLGI #2 consistency. If user desires to utilize another type of lubricant, they take responsibility for flushing bearings and lines, and maintaining a lubricant that is compatible with the installation.

Check mark

A NLGI #2 grease is a light viscosity, low-torque, rust-inhibiting lubricant that is water resistant. Its temperature range is from -30°F to 200°F and capable of intermittent highs of 250°F.

Check mark

Bearings should be relubricated in accordance with the condition chart. See Condition Chart.

Check mark

Is the fan in operation?

Check mark

For best results, lubricate the bearing while the fan is in operation. Pump grease in slowly until a slight bead forms around the bearing seals. Excessive grease can damage seal and reduce life through excess contamination and/or loss of lubricant.

Check mark

Did a slight bead form around the bearing seals?

Check mark

In the event that the bearing cannot be seen, use no more than three injections with a hand operated grease gun.

Check mark

Number of injections used

Run this procedureArrow right

Fan Pulleys and Belts Replacement

Check mark

Replacing Pulleys and Belts

Check mark

1. Clean the motor and fan shafts.

Check mark

2. Loosen the motor plate mounting bolts to relieve the belt tension. Remove the belt.

Check mark

3. Loosen the pulley setscrews and remove the pulleys from the shaft. If excessive force is required to remove the pulleys, a three-jaw puller can be used. This tool, however, can easily warp a pulley. If the puller is used, inspect the trueness of the pulley after it is removed from the shaft. The pulley will need replacement if it is more than 0.020 inch out of true.

Check mark

4. Clean the bores of the pulleys and place a light coat of oil on the bores.

Check mark

5. Remove any grease, rust or burrs from pulleys.

Check mark

6. Place the fan pulley on the fan shaft and the motor pulley on the motor shaft. Damage to the pulleys can occur when excessive force is used in placing the pulleys on their respective shafts.

Check mark

7. After the pulleys have been correctly placed back onto their shafts, tighten the pulley setscrews.

Check mark

Belt and Pulley Installation:

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Loren Cook Company

Explore Other Assets