Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Liquid Controls Flow Meter MA-7
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Gap Check
Initial Inspection
Look for gaps when disassembling the meter
Check for gaps between the bearing plate and housing using a feeler gauge
Gap Analysis
Check the bearing plates for flatness with a straight edge
Are there any shock problems causing the gaps?
Resolution
Have shock problems been resolved?
Contact your full-service distributor for assistance if shock problems exist
Flange Gaskets Maintenance
Removing Flange Gaskets
Remove flange gaskets when removing the flange assembly
Carefully scrape off the flange gaskets
Ensure the flange surface has been scraped clean
Installing New Flange Gaskets
Discard the old flange gasket
Install a new flange gasket
Confirm that no old flange gaskets are reused
Flow Meter Maintenance
Pre-Maintenance Safety Checks
Ensure all internal pressures are relieved and all liquid is drained from the system.
Verify that the pressure is 0 psi.
Close all liquid and vapor lines between the meter and liquid source.
Refer to local authorities and relevant NFPA Codes for safety rules.
Prevent Pipe Strain or Stress
Are all pipes supported independently of the meter?
Can the meter and accessories be removed without affecting the pipes or pipe alignment?
Handling Precision Machined Surfaces
O-Rings Check
O-Rings Inspection
Check the O-rings for damage
Identify the condition of the O-rings
Action Based on Inspection
Do the O-rings need replacement?
Is there a sign of shock problems?
Follow-up Actions
Replace damaged O-rings if necessary
Describe any shock problems observed
Bearning Plates Check
Check the bearing plates for flatness using a straight edge
Are there any warped bearing plates?
If shock problems exist, contact your full-service distributor for assistance
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX