

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Liquid Controls Flow Meter MA-4
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Gap Check
Initial Inspection
Look for gaps when disassembling the meter
Check for gaps between the bearing plate and housing using a feeler gauge
Gap Analysis
Check the bearing plates for flatness with a straight edge
Are there any shock problems causing the gaps?
Resolution
Have shock problems been resolved?
Contact your full-service distributor for assistance if shock problems persist
Bearning Plates Check
Check the bearing plates for flatness using a straight edge
Inspect for shock problems
Contact your full-service distributor for assistance if shock problems exist
Threads Maintenance
Repair Pulled Threads
Repair pulled threads with threaded insert fasteners
Contact your full-service distributor for advice if needed
Coat Threads with Anti-Seize
Coat threads with anti-seize when removing bolts
Coat threads with anti-seize when replacing bolts
Coat threads with anti-seize when removing castings in the meter
Coat threads with anti-seize when replacing castings in the meter
O-Rings Check
O-Rings Inspection
Check the O-rings for damage
Identify the condition of the O-rings
Action Based on Inspection
Do the O-rings need replacement?
Is there a sign of shock problems?
Follow-up Actions
Replace damaged O-rings if necessary
Contact full-service distributor for assistance if shock problems are detected
Packing Gland Replacement
Preparation
Has the internal pressure been relieved to zero?
Packing Gland Removal
Remove the two screws on the packing gland retaining plate with a 5/16" socket and ratchet drive extension or 5/16" nut driver.
Pull out the packing gland.
Pry off the retaining ring with a standard screwdriver.
Pull the driver out from the assembly.
Retaining Plate Installation
Select the mounting option for the retaining plate based on the presence of a counter adapter dust cover.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













