

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Liquid Controls Flow Meter M-10
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pressure Relief Maintenance
WARNING
Acknowledge understanding of the warning
Relieving Internal Pressure Procedure for LPG and NH₃ Meters
Close the belly valve of the supply tank.
Close the valve on the vapor return line.
Close the manual valve in the supply line on the inlet side of the meter.
Is there a manual valve on the inlet side of the meter?
Consult the truck manufacturer for procedures to depressurize the system if no manual valve exists.
Slowly open the valve/nozzle at the end of the supply line.
Gap Check
Gap Inspection
Look for gaps when disassembling the meter
Use a feeler gauge to check for gaps between the bearing plate and housing
Are there any gaps found?
Bearing Plate Check
Check the bearing plates for flatness with a straight edge if gaps are found
Shock Problem Resolution
Do shock problems exist?
Describe the shock problems if they exist
Threads Maintenance
Repair Pulled Threads
Repair pulled threads with threaded insert fasteners
Contact distributor for advice if needed
Coat Threads with Anti-Seize
Coat threads with anti-seize when removing bolts
Coat threads with anti-seize when replacing bolts
Coat threads with anti-seize when removing castings
Coat threads with anti-seize when replacing castings
Packing Gland Replacement
Preparation
Ensure all internal pressure is relieved to zero before starting the procedure.
Packing Gland Removal
Remove the two screws on the packing gland retaining plate using a 5/16" socket and ratchet drive extension or 5/16" nut driver.
Pull out the packing gland.
Pry off the retaining ring with a standard screwdriver.
Pull the driver out from the assembly.
Retaining Plate Installation
Select the mounting option for the retaining plate based on the presence of a counter adapter dust cover.
O-Rings Check
O-Rings Inspection
Check the O-rings for damage
Identify the condition of the O-rings
Action Based on Inspection
Do the O-rings need replacement?
Is there a shock problem indicated by nibbled O-rings?
Follow-up Actions
Replace damaged O-rings if necessary
Contact full-service distributor for assistance if shock problem is suspected
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













