MaintainX Asset Hub logo
EnterprisePricing
JUNGHEINRICH

JUNGHEINRICH Pallet Stacker EJC 112N

Need answers fast?
Explore the manual using AI.

JUNGHEINRICH Pallet Stacker EJC 112N
JUNGHEINRICH Pallet Stacker EJC 112N

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for JUNGHEINRICH Pallet Stacker EJC 112N

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

JUNGHEINRICH Pallet Stacker EJC 112N

JUNGHEINRICH Pallet Stacker EJC 112N

Create an account to install this asset package.

Maintenance Plans for JUNGHEINRICH Pallet Stacker Model EJC 112N

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Lead Acid Batteries (Armour Plated Cells, Liquid Electrolyte) Maintenance

Check mark

Charge the battery after each discharge

Check mark

After charging, check the electrolyte level of each battery cell and replenish as required

Check mark

Open the plug (15)

Check mark

Is it necessary to add electrolyte with pure water up to the 'Max' electrolyte level marking (17)?

Check mark

Close the plug (15)

Check mark

The electrolyte level should not be less than the 'Min' electrolyte marking (16) and must not exceed the 'Max' (17) marking

Check mark

Quality of Water for Adding Electrolyte

Check mark

The quality of the water used to add electrolyte must correspond to purified or distilled water

Check mark

Select the type of water used

Run this procedureArrow right

1 Yearly PzV, PzV-BS Lead Acid Batteries (Sealed Armour Plated Cells) Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

Measure the insulation resistance of the truck in accordance with EN 1175-1

Check mark

Measure the insulation resistance of the battery in accordance with DIN EN 1987-1

Check mark

In accordance with DIN EN 50272-3 the battery insulation resistance should not be less than 50 Ω per volt of rated voltage

Check mark

Does the battery insulation resistance meet the required standard?

Check mark

Sign off on the battery maintenance

Run this procedureArrow right

PzV, PzV-BS Lead Acid Batteries (Sealed Armour Plated Cells) Charging

Check mark

WARNING! The gases produced during charging can cause explosions. Always disconnect the charger and truck before connecting or disconnecting the charger and battery.

Check mark

The charger must be adapted to the battery in terms of voltage, charge capacity and battery technology.

Check mark

Check all cables and plug connections for visible signs of damage

Check mark

Ventilate the room in which the truck is being charged. Battery cell surfaces must remain exposed during charging in order to ensure sufficient ventilation.

Check mark

Do not smoke and avoid naked flames when handling batteries. Fire protection equipment must be available.

Check mark

Do not place any metallic objects on the battery. Always follow the safety regulations of the battery and charger station manufacturers.

Check mark

NOTE: Charging the battery incorrectly can result in material damage. Always charge the battery with DC current.

Check mark

All DIN 41773 charging procedures are permitted in the format approved by the manufacturer. Always connect the battery to a charger that is appropriate to the size and type of the battery.

Check mark

Do not exceed the limit currents in accordance with DIN EN 50272-3 in the gassing area.

Run this procedureArrow right

1 Yearly Lead Acid Batteries (Armour Plated Cells, Liquid Electrolyte) Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

Measure the insulation resistance of the truck in accordance with EN 1175-1

Check mark

Measure the insulation resistance of the battery in accordance with DIN EN 1987-1

Check mark

Battery insulation resistance not less than 50 Ω per volt of rated voltage?

Check mark

Sign off on the battery maintenance

Run this procedureArrow right

1 Weekly Lead Acid Batteries (Armour Plated Cells, Liquid Electrolyte) Maintenance

Check mark

After re-charging, is there any visible dirt or physical damage?

Check mark

Is the battery charged regularly according to the IU characteristic?

Check mark

Carry out a compensation charge

Check mark

Sign off on the battery maintenance

Run this procedureArrow right

Parts for JUNGHEINRICH Pallet Stacker EJC 112N

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

H-Lp 46, DIN 51524, 5.0 l, Used For Hydraulic System

29200670

Fuchs Titan Gear Hsy 75W-90, 5.0 l, Used For Transmission

50380904

Polylub Ga 352P, 1.0 kg, Used For Lubrication

29202050

Chain Spray, 0.4 l, Used For Chains

29201280

H-Lp 46, DIN 51524, 5.0 l, Used For Hydraulic System

29200670

Fuchs Titan Gear Hsy 75W-90, 5.0 l, Used For Transmission

50380904

Polylub Ga 352P, 1.0 kg, Used For Lubrication

29202050

Chain Spray, 0.4 l, Used For Chains

29201280

H-Lp 46, DIN 51524, 5.0 l, Used For Hydraulic System

29200670

Fuchs Titan Gear Hsy 75W-90, 5.0 l, Used For Transmission

50380904

Polylub Ga 352P, 1.0 kg, Used For Lubrication

29202050

Chain Spray, 0.4 l, Used For Chains

29201280

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from JUNGHEINRICH

Explore Other Assets