MaintainX Asset Hub logo
EnterprisePricing
JLG

JLG Driveable Stock Picker 15MVL

Need answers fast?
Explore the manual using AI.

JLG Driveable Stock Picker 15MVL
JLG Driveable Stock Picker 15MVL

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

JLG Driveable Stock Picker 15MVL

JLG Driveable Stock Picker 15MVL

Create an account to install this asset package.

Maintenance Plans for JLG Driveable Stock Picker Model 15MVL

Integrate maintenance plans directly into your work orders in MaintainX.

Hydraulic Pressure Adjustment

Check mark

Warning: Only trained personnel should perform this procedure.

Check mark

Turning adjustment screw clockwise increases system pressure, turning screw counterclockwise decreases system pressure.

Check mark

Perform pressure adjustment with oil at normal operating temperature.

Check mark

Enter the current system pressure

Check mark

Select the direction of adjustment

Check mark

Enter the adjusted system pressure

Check mark

Did the platform raise with maximum rated capacity?

Check mark

Sign off on the hydraulic pressure adjustment

Run this procedureArrow right

Battery Replacement

Check mark

Warning: Only use JLG approved batteries for replacement. Non-approved batteries may result in performance issues or battery charger fault codes.

Check mark

Warning: DO NOT REPLACE ITEMS CRITICAL TO STABILITY, SUCH AS BATTERIES, WITH ITEMS OF DIFFERENT WEIGHT OR SPECIFICATION. DO NOT MODIFY UNIT IN ANY WAY TO AFFECT STABILITY.

Check mark

Is the replacement battery JLG approved?

Check mark

Is the replacement battery of equivalent voltage and amperage output as the OEM battery?

Check mark

Is the replacement battery weight equivalent to OEM per battery?

Check mark

Sign off on the battery replacement

Run this procedureArrow right

Mast Chain and Cable Adjustment

Check mark

Warning: NEVER WORK UNDER AN ELEVATED PLATFORM UNTIL PLATFORM HAS BEEN SAFELY RESTRAINED FROM ANY MOVEMENT BY BLOCKING OR OVERHEAD SLING.

Check mark

With mast retracted, is the platform at the bottom of travel?

Check mark

Are all chain/cable sets seated in their sheaves properly at the top of each mast section?

Check mark

Enter the amount of adjustment necessary to obtain the 7/16 in. (12mm) step for mast sections-3 and up.

Check mark

Adjust one mast section at a time starting from the back (section-3, section-4, etc.) of the mast and work forward.

Check mark

Is the platform elevated until the chain/cable anchor adjust nuts are accessible at the front and bottom of each mast section?

Check mark

Is the bottom (jam) nut on each chain/cable loosened?

Check mark

Is the adjusting nut against the anchor plate on each chain/cable adjusted?

Check mark

Are the (threaded ends) studs protruding on the adjustments equal side to side on a mast section?

Run this procedureArrow right

1 Yearly Driveable Stock Picker Maintenance

Check mark

Mast Assembly:

Check mark

- Mast Sections: Visual inspection for damage, cracks, distortion, or excessive wear. Operates properly.

Check mark

- Chain Systems: Properly lubricated. Inspected per Service and Maintenance Manual.

Check mark

- Sequence Cable Systems: Check for proper and secure installation. Visual inspection for damage, cracks, distortion, or excessive wear. Check for proper adjustment.

Check mark

- Covers or Shields: Check for proper and secure installation.

Check mark

- Sheave Systems: Check for proper and secure installation. Visual inspection for damage, cracks, distortion, or excessive wear.

Check mark

- Bearings: Check for proper and secure installation. Visual inspection for damage, cracks, distortion, or excessive wear.

Check mark

- Slide Pads: Check for proper and secure installation. Visual inspection for damage, cracks, distortion, or excessive wear.

Check mark

Platform Assembly:

Run this procedureArrow right

Battery Test

Check mark

NOTE: Batteries in storage should be kept at 12.5V or higher.

Check mark

Before testing for battery condition, the open circuit voltage should be taken from each battery. If the voltage of the batteries differs by 0.3 volts or more, the lower voltage battery should be replaced.

Check mark

Battery Testing Can Be Performed In Two Ways:

Check mark

1. The batteries can be tested using a battery tester capable of testing 12V 100Ah AGM VRLA (Valve Regulated Lead Acid) batteries, using the instructions of the battery tester manufacturer.

Check mark

2. If an appropriate battery tester is unavailable, the batteries can be tested by fully charging them withthe charger that is installed on the machine. Then check the battery voltage of each battery - 4 hours - after charging is complete. Batteries less than 12.72 volts should be replaced.

Check mark

NOTE: If a faulty charger is suspected, the batteries can be charged using a charger that supplies 2.45 volts/cell.

Check mark

Charging should be terminated when the charge current drops below 1 amp.;

Run this procedureArrow right

Parts for JLG Driveable Stock Picker 15MVL

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Di-Electric Grease

3020038

Ground Control Station, For Removal Of Electrical Connector Pins From The Ground Control Station Connectors

7016618

Drive Motor, For Removal Of Electrical Connector Pins From The Drive Motor Main Power Connectors

7002841

Drive Motor, Brake For Removal Of Electrical Connector Pins From The Drive Motor Brake Power Connectors

7002842

Anerobic Thread Locking Compound, Medium Strength (Blue)

0100011

Di-Electric Grease

3020038

Ground Control Station, For Removal Of Electrical Connector Pins From The Ground Control Station Connectors

7016618

Drive Motor, For Removal Of Electrical Connector Pins From The Drive Motor Main Power Connectors

7002841

Drive Motor, Brake For Removal Of Electrical Connector Pins From The Drive Motor Brake Power Connectors

7002842

Anerobic Thread Locking Compound, Medium Strength (Blue)

0100011

Di-Electric Grease

3020038

Ground Control Station, For Removal Of Electrical Connector Pins From The Ground Control Station Connectors

7016618

Drive Motor, For Removal Of Electrical Connector Pins From The Drive Motor Main Power Connectors

7002841

Drive Motor, Brake For Removal Of Electrical Connector Pins From The Drive Motor Brake Power Connectors

7002842

Anerobic Thread Locking Compound, Medium Strength (Blue)

0100011

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from JLG

Explore Other Assets