

The Greenheck Warehouse Make Up Air Unit DGX-118 is a high-efficiency air handling solution designed for optimal indoor air quality. This unit effectively provides conditioned air to large spaces, ensuring comfort and compliance with ventilation standards. Ideal for warehouses and industrial applications, it combines robust performance with reliable operation.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Greenheck Warehouse Make Up Air Unit DGX-118
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
V-Belt Drive Maintenance
Warning: This maintenance check requires trained personnel with PPE!
Check for wear, tension, alignment, and dirt accumulation
Measure the deflection in the belt
Check the alignment using a straight edge across both sheaves
Account for differences in sheave width
Check for premature or frequent belt failures
Check for abnormally high belt tension or drive misalignment
Check for abnormally low belt tension
Ensure belts are not pried on or off the sheave
Cooling Coil Maintenance
Repair and replacement of the coil and the connecting piping, valves, etc., must be performed by a qualified individual
Inspect the coil for signs of corrosion and/or leaks
Repair any leaks as required
Inspect the coil’s surface for foreign material. If the coil surface needs cleaning, clean the coil from the leaving air-side so that foreign material will be washed out of the coil rather than pushed farther in
Inspect and clean the drain pan to prevent the growth of algae and other organisms
Be sure to read and follow the coil manufacturer’s recommendations before using any cleaning fluid
Caution must be used to avoid injury when venting the coil
High pressure and/or high temperature fluids can cause serious injuries
Sign off on the cooling coil maintenance
Motor Maintenance
Warning: Only trained personnel should perform this procedure
Motor exterior cleaned
Motor greased in accordance with manufacturer’s recommendations
Water or solvents entered the motor or bearings?
Motor and bearings sprayed with steam, water or solvents?
Motor lubricated if fittings are provided
Sign off on the motor maintenance
Blowing-Out Coils
Warning: This procedure should be performed by trained personnel only
Close valves on the supply and return lines
Open drain valves and/or drain plug
Remove vent plug to allow coil to drain faster
After coil is fully drained, connect a blower to the caps. Do not connect the blower to the air vent or drain plug
Close the vent plug on the header that the blower is connected to. Open the drain valve or cap on the other header
Turn on blower for 30 minutes
Place mirror at discharge. If the mirror fogs up, repeat procedure until no fog appears on the mirror
After drying the coil, wait a few minutes then repeat Step #5
Burner Maintenance
Warning: Ensure the burner is turned off and cooled down before starting the maintenance.
Inspect the burner for accumulation of scale on both the upstream and downstream sides of the mixing plates.
Remove foreign material with a wire brush.
Visually check that all holes in the mixing plates are clear.
If any burner ports are plugged (even partially), clear them with a piece of wire or another appropriate tool. Do not enlarge burner ports when clearing a blockage as performance could be affected.
Replace or tighten any loose or missing fasteners on the mixing plates.
Always use appropriate fasteners.
Inspect and clean the flame rod or UV scanner.
Occasional replacement of the flame rod and spark rod may be necessary to ensure optimum unit performance.
Access the parts list for your equipment in MaintainX.
Auto Drain & Fill Valve 1/4"
461263
Auto Drain & Fill Valve 1/2"
461262
Auto Drain & Fill Valve 3/4"
461264
Auto Drain & Fill Valve 1/4"
461263
Auto Drain & Fill Valve 1/2"
461262
Auto Drain & Fill Valve 3/4"
461264
Auto Drain & Fill Valve 1/4"
461263
Auto Drain & Fill Valve 1/2"
461262
Auto Drain & Fill Valve 3/4"
461264
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













