

The Greenheck Warehouse Make Up Air Unit DGX-108 is designed for efficient air management in industrial settings. This robust unit ensures optimal indoor air quality and temperature control, making it essential for warehouses and manufacturing facilities. With reliable performance and easy maintenance, the DGX-108 is a top choice for effective air handling solutions.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Greenheck Warehouse Make Up Air Unit DGX-108
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Burner Maintenance
Warning: Ensure the burner is turned off and cooled down before starting the maintenance.
Inspect the burner for accumulation of scale on both the upstream and downstream sides of the mixing plates.
Remove foreign material with a wire brush.
Visually check that all holes in the mixing plates are clear.
If any burner ports are plugged (even partially), clear them with a piece of wire or another appropriate tool. Do not enlarge burner ports when clearing a blockage as performance could be affected.
Replace or tighten any loose or missing fasteners on the mixing plates.
Always use appropriate fasteners.
Inspect and clean the flame rod or UV scanner.
Occasional replacement of the flame rod and spark rod may be necessary to ensure optimum unit performance.
Blowing-Out Coils
Warning: This procedure should be performed by trained personnel only.
Close valves on the supply and return lines
Open drain valves and/or drain plug
Remove vent plug to allow coil to drain faster
After coil is fully drained, connect a blower to the caps. Do not connect the blower to the air vent or drain plug
Close the vent plug on the header that the blower is connected to. Open the drain valve or cap on the other header
Turn on blower for 30 minutes
Place mirror at discharge. If the mirror fogs up, repeat procedure until no fog appears on the mirror
After drying the coil, wait a few minutes then repeat Step #5
V-Belt Drive Maintenance
Warning: This maintenance check requires trained personnel with PPE!
Check for wear, tension, alignment, and dirt accumulation
Measure the deflection in the belt
Check the alignment using a straight edge across both sheaves
Account for differences in sheave width
Check for premature or frequent belt failures
Check for abnormally high belt tension or drive misalignment
Check for abnormally low belt tension
Ensure belts are not pried on or off the sheave
Chilled Water Coil Maintenance
Test the circulating fluid for sediment, corrosive products and biological contaminants
Describe the corrective measures taken if any contaminants were found
Maintain adequate fluid velocities and proper filtering of the fluid
Are automatic air vents utilized?
If automatic air vents are not utilized, periodic venting of the coil is recommended to remove accumulated air
Sign off on the chilled water coil maintenance
Supply Wheel Service
Warning: This service requires trained personnel with PPE!
Is there oil and dust accumulation on the wheel?
If there is oil and dust accumulation, proceed with the cleaning procedure
Was the wheel cleaned properly?
Was the housing cleaned properly?
Enter the balance reading of the wheel after cleaning
Sign off on the supply wheel service
Access the parts list for your equipment in MaintainX.
Auto Drain & Fill Valve 3/4"
461264
Auto Drain & Fill Valve 1/2"
461262
Auto Drain & Fill Valve 1/4"
461263
Auto Drain & Fill Valve 3/4"
461264
Auto Drain & Fill Valve 1/2"
461262
Auto Drain & Fill Valve 1/4"
461263
Auto Drain & Fill Valve 3/4"
461264
Auto Drain & Fill Valve 1/2"
461262
Auto Drain & Fill Valve 1/4"
461263
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













