MaintainX, an Autodesk company
EnterprisePricing
FRISTAM

FRISTAM FDS Positive Displacement Pump FDS 2

Need answers fast?
Explore the manual using AI.

FRISTAM FDS Positive Displacement Pump FDS 2
FRISTAM FDS Positive Displacement Pump FDS 2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for FRISTAM FDS Positive Displacement Pump FDS 2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

FRISTAM FDS Positive Displacement Pump FDS 2

FRISTAM FDS Positive Displacement Pump FDS 2

Create an account to install this asset package.

Maintenance Plans for FRISTAM FDS Positive Displacement Pump Model FDS 2

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Mechanical Seal Inspection

Check mark

Visual Inspection

Check mark

Inspect mechanical seal for visible leakage

Check mark

Is the mechanical seal free from visible damage?

Check mark

Post Inspection

Check mark

Record inspection results in the maintenance log

Check mark

Inspector's signature

Run this procedureArrow right

FDS Positive Displacement Pump Cleaning

Check mark

Preliminary Flush

Check mark

Perform preliminary flush with water

Check mark

Caustic Flush

Check mark

Enter the concentration of NaOH used (in %)

Check mark

Perform caustic flush with NaOH

Check mark

Intermediate Flush

Check mark

Perform intermediate flush with water

Check mark

Acid Flush

Check mark

Enter the concentration of HNO3 used (in %)

Run this procedureArrow right

Periodic Pump Inspection

Check mark

Visual Inspection

Check mark

Inspect the following components for wear or damage

Check mark

Assessment of Wear

Check mark

Is there any sign of wear on the inspected components?

Check mark

Describe the wear observed, if any

Check mark

Potential Causes of Wear

Check mark

Identify potential causes of wear

Check mark

Post Inspection

Check mark

Document findings in the maintenance log

Run this procedureArrow right

1 Yearly Mechanical Seal Replacement

Check mark

Seal Replacement Preparation

Check mark

Ensure the equipment is powered off and locked out

Check mark

Gather all necessary tools and replacement parts

Check mark

Seal Wear Parts Replacement

Check mark

Replace all seal wear parts

Check mark

Post Replacement Inspection

Check mark

Inspect the new seal for proper installation

Check mark

Is the equipment operating normally after replacement?

Check mark

Documentation and Cleanup

Run this procedureArrow right

4000 Hourly Gearbox Oil Maintenance

Check mark

Lubrication Check

Check mark

Check the oil level in the sight glass

Check mark

Is the oil level correct?

Check mark

Oil Change

Check mark

Select the operating condition

Check mark

Enter the current operating hours of the gearbox

Check mark

Is it time to change the oil?

Check mark

Change the gearbox oil

Check mark

Post Maintenance

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from FRISTAM

Explore Other Assets