MaintainX Logo
EnterprisePricing
FRISTAM

FRISTAM Pump FZX 2200

Need answers fast?
Explore the manual using AI.

FRISTAM Pump FZX 2200
FRISTAM Pump FZX 2200

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for FRISTAM Pump FZX 2200

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

FRISTAM Pump FZX 2200

FRISTAM Pump FZX 2200

Create an account to install this asset package.

Maintenance Plans for FRISTAM Pump Model FZX 2200

Integrate maintenance plans directly into your work orders in MaintainX.

9500 Hours Motor Lubrication

Check mark

Use a high grade ball and roller bearing grease. Recommendations for standard service conditions include Shell Dolium R or Chevron SRI.

Check mark

Note:

Check mark

If frame size Up to 210 (132) inclusive 12,000 hours

Check mark

If frame size Over 210 to 280 (132 to 180) inclusive 9,500 hours

Check mark

If frame size Over 280 to 360 (225) inclusive 7,400 hours

Check mark

For severe service conditions, multiply interval hours by .5. For extreme service conditions, multiply interval hours by .1;

Run this procedureArrow right

Pump Cleaning

Check mark

SIP Process

Check mark

FP/FPX series pumps should only be used for SIP (Sterilization In Place) process with the prior approval of Fristam

Check mark

Suitability may depend on selected elastomers and/or process temperatures

Check mark

CIP Process

Check mark

FP/FPX series pumps are suitable for the CIP (Cleaning In Place) process

Check mark

The following is a general example of the CIP process

Check mark

• Preliminary flush with water

Check mark

• Caustic flush (NaOH, ~1-2%)

Check mark

• Intermediate flush with water

Run this procedureArrow right

1 Yearly Mechanical Seal Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

Disconnect the energy source to the pump and observe all lock out/tag out procedures.

Check mark

Inspect all elastomers when performing pump maintenance.

Check mark

Replace elastomers (o-rings and gaskets) during seal, pump shaft and/or motor replacements.

Check mark

Inspect the pump shaft and collar annually for wear.

Check mark

Inspect the shaft collar bolt(s) annually or more often in corrosive environments.

Check mark

Disconnect the suction and discharge piping.

Check mark

Remove the pump cover and cover gasket.

Check mark

Remove the impeller by pulling the impeller toward you.

Run this procedureArrow right

Parts for FRISTAM Pump FZX 2200

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Cover Nut

1103000028

Pump Cover

1512620000

Impeller Nut

1954000007

Cover Gasket (Buna)

1180000363

Impeller Nut Gasket

1181000083

Cover Nut

1103000028

Pump Cover

1512620000

Impeller Nut

1954000007

Cover Gasket (Buna)

1180000363

Impeller Nut Gasket

1181000083

Cover Nut

1103000028

Pump Cover

1512620000

Impeller Nut

1954000007

Cover Gasket (Buna)

1180000363

Impeller Nut Gasket

1181000083

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from FRISTAM

Explore Other Assets