Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Frick Rotary Screw Compressor RWF II 100
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
200 Hourly Strainers Cleaning
Clean oil strainers
Strainer - demand oil pump
To clean the demand oil pump strainer, the unit must be shut down. The procedure is as follows:
1. Push [STOP] key on microprocessor panel to shutdown unit, then open disconnect switches for compressor and oil pump motor starters.
2. Close strainer inlet service valve.
3. Open drain valve located in the strainer cover and drain oil into a container.
4. Remove capscrews securing strainer cover, strainer cover, gasket and element. Retain gasket.
5. Wash element in solvent and blow clean with air.
6. Wipe strainer body cavity clean with a lint-free clean cloth.
30000 Hourly Coalescers Filter Element Change
Coalescer filter element
When changing the coalescer filter element(s) it is recommended that the oil be changed, cartridge(s) in oil filters OF-1 and OF-2 if applicable be changed and the following applicable strainer elements be removed and cleaned.
NOTICE
Use of filter elements other than Frick may cause warranty claim to be denied.
1. See Changing oil, Steps 1 through 8.
2. Loosen manway cover retainer bolts, remove retainers, manway cover and cover gasket. Discard cover gasket.
3. Remove and retain nut securing coalescer filter retainer.
4. Remove retainer, coalescer filter element and 2 O-rings. Discard filter elements.' 5. Install new coalescer filter element(s).
NOTICE
200 Hourly Rotary Screw Compressor Check
Check coupling: Check bolts, shim packs, center inserts, keys, and all bolt torques.
Check alignment: Refer to 070.210-IB for foot mounting alignment.
Suction and discharge flange bolts: Verify tightness of bolts on suction and discharge flanges. See Table 13 for torque requirements.
Check electrical connections: Check and torque all terminals in the processor and starter panel per the specification posted in the enclosure.
Check sensor calibration: Check calibration of slide valve, slide stop, pressures and temperatures. Calibration should be conducted with NIST certified devices.
Sign off on the 200 Hourly Rotary Screw Compressor Check
1 Daily Compressor Unit Check
Maintenance program
Check the compressor unit daily for leaks
Check for abnormal vibration
Check for abnormal noise
Check for proper operation
Log any issues found during the check
Initial oil analysis reading
Vibration analysis reading
Sign off on the daily compressor unit check
Oil Level Transmitter Replacement
Warning: This procedure requires trained personnel with PPE!
The Oil Level Transmitter is located on the front of the separator near the bottom/center.
The linear transmitter with hermetic enclosure is based on the capacitive measuring principle.
It features removable electronics (from the sensor well) eliminating the need to evacuate the compressor for replacement. This transmitter is dedicated to oil level control and has no user adjustments.
Shut off control power.
Remove DIN connector plug from transmitter.
Loosen set screws.
Remove transmitter unit.
Install new transmitter unit.
Access the parts list for your equipment in MaintainX.
Rotary Screw Compressor
US2430129999900010
Frick Optical Isolation Kits
639C0133G01
Oil Analysis Kit
333Q0001853
O-Ring 1 1⁄16-12 UN-2B
980A0012K66
O-Ring 9/16-18 UNF-2B
980A0012K60
Rotary Screw Compressor
US2430129999900010
Frick Optical Isolation Kits
639C0133G01
Oil Analysis Kit
333Q0001853
O-Ring 1 1⁄16-12 UN-2B
980A0012K66
O-Ring 9/16-18 UNF-2B
980A0012K60
Rotary Screw Compressor
US2430129999900010
Frick Optical Isolation Kits
639C0133G01
Oil Analysis Kit
333Q0001853
O-Ring 1 1⁄16-12 UN-2B
980A0012K66
O-Ring 9/16-18 UNF-2B
980A0012K60
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX