

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Edan Instruments Electrocardiograph SE-3
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
24 Monthly Electrode Maintenance
Safety Checks
Inspect the equipment and accessories for mechanical and functional damage.
Inspect the safety relevant labels for legibility.
Inspect the fuse to verify compliance with rated current and breaking characteristics.
Verify the device functions properly as described in the instructions for use.
Electrical Tests
Test the protection earth resistance according to IEC 601-1/1988: Limit 0.2 ohm.
Test the earth leakage current according to IEC 601-1/1988: Limit: NC 500uA, SFC 1000uA.
Test the patient leakage current according to IEC 601-1/1988: Limit: 10uA (CF).
Battery Replacement
Pre-Replacement Safety Checks
Verify that the battery's useful life is over or there is a foul smell and leakage.
Is the battery compartment opened by a qualified service engineer authorized by EDAN?
Battery Replacement
Ensure the following before replacing the battery
Post-Replacement Disposal
Contact the manufacturer or local distributor for battery disposal.
Dispose of the battery according to local regulations if not contacting the manufacturer.
1 Monthly Print Head Cleaning
Preparation
Open the recorder casing
Remove the paper from the recorder
Cleaning the Print Head
Dampen a clean soft cloth with 75% alcohol
Wipe the print head gently with the dampened cloth
For stubborn stains, soak with a little alcohol and wipe off with a clean soft cloth
Post-Cleaning
Allow the print head to air dry
24 Monthly Main Unit Maintenance
Safety Checks
Inspect the equipment and accessories for mechanical and functional damage.
Inspect the safety relevant labels for legibility.
Inspect the fuse to verify compliance with rated current and breaking characteristics.
Verify the device functions properly as described in the instructions for use.
Electrical Safety Tests
Test the protection earth resistance according to IEC 601-1/1988: Limit 0.2 ohm.
Test the earth leakage current according to IEC 601-1/1988: Limit: NC 500uA, SFC 1000uA.
Test the patient leakage current according to IEC 601-1/1988: Limit: 10uA (CF).
24 Monthly Patient Cable Maintenance
Safety Checks
Inspect the equipment and accessories for mechanical and functional damage.
Inspect the safety relevant labels for legibility.
Inspect the fuse to verify compliance with rated current and breaking characteristics.
Verify the device functions properly as described in the instructions for use.
Electrical Tests
Test the protection earth resistance according to IEC 601-1/1988: Limit 0.2 ohm.
Test the earth leakage current according to IEC 601-1/1988: Limit: NC 500uA, SFC 1000uA.
Test the patient leakage current according to IEC 601-1/1988: Limit: 10uA (CF).
Access the parts list for your equipment in MaintainX.
Power Cord
M13-36014
Patient Cable
MS1-18503
Chest Electrodes
MS1-18504
Limb Electrodes
MS1-18505
Paper Roller
MS1-19927
Power Cord
M13-36014
Patient Cable
MS1-18503
Chest Electrodes
MS1-18504
Limb Electrodes
MS1-18505
Paper Roller
MS1-19927
Power Cord
M13-36014
Patient Cable
MS1-18503
Chest Electrodes
MS1-18504
Limb Electrodes
MS1-18505
Paper Roller
MS1-19927
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













