Eaton Switchboard PRL3X

Need answers fast?
Explore the manual using AI.

Eaton Switchboard PRL3X
Eaton Switchboard PRL3X

The Eaton Switchboard PRL3X is a robust electrical distribution solution designed for industrial applications. This switchboard ensures reliable power management and protection, featuring advanced technology for optimal performance and safety. Ideal for various operational environments, the PRL3X enhances efficiency and minimizes downtime.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Eaton Switchboard PRL3X

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Eaton Switchboard PRL3X

Eaton Switchboard PRL3X

Create an account to install this asset package.

Maintenance Plans for Eaton Switchboard Model PRL3X

Integrate maintenance plans directly into your work orders in MaintainX.

Fuse Replacement

Check mark

Switch mechanism is turned to the OFF position

Check mark

Visual inspection of the switch contacts, blades, and mechanism

Check mark

Mechanism is in the OPEN/OFF position

Check mark

Fuses are of the proper class, ampere, voltage, and interrupting rating

Check mark

Non–current-limiting fuses are not used as replacements for current-limiting fuses

Check mark

Rejection mechanisms are not defeated

Check mark

Sign off on the fuse replacement

Run this procedureArrow right

Ventilation Maintenance

Check mark

Check all grills and ventilation ports for obstructions and accumulations of dirt

Check mark

Clean ventilation ports, if necessary

Check mark

For switchboards installed outdoors, inspect the air space under the switchboard to be sure that it is clean and clear of debris, leaves, and obstructions

Check mark

Sign off on the ventilation maintenance

Run this procedureArrow right

1 Year Cleaning

Check mark

Warning: Ensure the switchboard is de-energized before starting the cleaning process

Check mark

Removal of dust and debris from bus bars, connections, supports, and enclosure surfaces

Check mark

Wipe clean with a lint-free cloth

Check mark

Warning: Do not use solvents to clean equipment, as damage to surfaces can occur

Check mark

Was the switchboard exposed to adverse conditions, such as airborne contaminants?

Check mark

Warning: Do not use compressed air in cleaning

Check mark

Perform a second Megger or DC test of the switchboard insulation between phases and ground

Check mark

Warning: Prior to testing, remove all control power fusing and connections to products, which will be damaged in this test

Check mark

Sign off on the cleaning process

Run this procedureArrow right

Circuit Breaker Inspection

Check mark

Visual inspection for signs of discoloration, cracking, scorching, overheating, or broken parts

Check mark

Exercise the breaker operating mechanism, making sure it is opening and closing

Check mark

Breaker showing signs of any one of these issues

Check mark

If breaker shows signs of any issues, it should be replaced

Check mark

Sign off on the circuit breaker inspection

Run this procedureArrow right

Insulation Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

Visual check for damage on bus bar and structure insulation

Check mark

List of damaged parts

Check mark

Upload a photo of the damaged parts

Check mark

Choose the type of service done

Check mark

Sign off on the insulation maintenance

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Eaton

Explore Other Assets