MaintainX Logo
EnterprisePricing
Eaton

Eaton Distribution Panel PRL1B

Need answers fast?
Explore the manual using AI.

Eaton Distribution Panel PRL1B
Eaton Distribution Panel PRL1B

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Eaton Distribution Panel PRL1B

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Eaton Distribution Panel PRL1B

Eaton Distribution Panel PRL1B

Create an account to install this asset package.

Maintenance Plans for Eaton Distribution Panel Model PRL1B

Integrate maintenance plans directly into your work orders in MaintainX.

Secondary Wiring Check

Check mark

Check all wiring connections for tightness, including those at the current and potential transformers, if present, and at all terminal blocks

Check mark

Check all secondary wiring connections to ensure that they are properly connected to the switchboard ground bus, where indicated

Check mark

Look for broken wire strands and pinched or damaged insulation

Check mark

Sign off on the secondary wiring check

Run this procedureArrow right

1 Year Cleaning

Check mark

Warning: Ensure the switchboard is de-energized before starting the cleaning process

Check mark

Switchboard de-energized?

Check mark

Upload a photo of the switchboard before cleaning

Check mark

Dust and debris removed from bus bars, connections, supports, and enclosure surfaces?

Check mark

Switchboard wiped clean with a lint-free cloth?

Check mark

Was solvent used in cleaning?

Check mark

Warning: Do not use solvents to clean equipment, as damage to surfaces can occur

Check mark

Was compressed air used in cleaning?

Check mark

Warning: Do not use compressed air in cleaning. It may imbed the contaminants within overcurrent devices, metering equipment, and other components

Run this procedureArrow right

Ventilation Maintenance

Check mark

Check all grills and ventilation ports for obstructions and accumulations of dirt

Check mark

Clean ventilation ports, if necessary

Check mark

For switchboards installed outdoors, inspect the air space under the switchboard to be sure that it is clean and clear of debris, leaves, and obstructions

Check mark

Sign off on the ventilation maintenance

Run this procedureArrow right

Bus and Cable Connection Inspection

Check mark

Inspect bus bar and cables for visible damage

Check mark

Visually inspect connections for overheating and damage

Check mark

All bus bar and cable connections checked and torqued in accordance with labeling on the switchboard

Check mark

Inspect for broken wire strands and pinched or damaged insulation on cable connections

Check mark

Sign off on the inspection

Run this procedureArrow right

Circuit Breaker Inspection

Check mark

Visual inspection for signs of discoloration, cracking, scorching, overheating, or broken parts

Check mark

Operating mechanism opens and closes properly

Check mark

Breaker needs replacement?

Check mark

Sign off on the circuit breaker inspection

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Eaton

Explore Other Assets