MaintainX Logo
EnterprisePricing
Eaton

Eaton Distribution Panel PRL2A

Need answers fast?
Explore the manual using AI.

Eaton Distribution Panel PRL2A
Eaton Distribution Panel PRL2A

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Eaton Distribution Panel PRL2A

Eaton Distribution Panel PRL2A

Create an account to install this asset package.

Maintenance Plans for Eaton Distribution Panel Model PRL2A

Integrate maintenance plans directly into your work orders in MaintainX.

Circuit Breaker Inspection

Check mark

Visual inspection for signs of discoloration, cracking, scorching, overheating, or broken parts

Check mark

Exercise the breaker operating mechanism, making sure it is opening and closing

Check mark

Breaker showing signs of any one of these issues

Check mark

If any issues are found, the breaker should be replaced

Run this procedureArrow right

1 Year Cleaning

Check mark

Warning: Ensure the switchboard is de-energized before starting the cleaning process

Check mark

Dust and debris removed from bus bars, connections, supports, and enclosure surfaces

Check mark

Switchboard wiped clean with a lint-free cloth

Check mark

Warning: Do not use solvents to clean equipment, as damage to surfaces can occur

Check mark

Was the switchboard exposed to adverse conditions, such as airborne contaminants?

Check mark

Warning: Do not use compressed air in cleaning

Check mark

Second Megger or DC test of the switchboard insulation between phases and ground performed

Check mark

Warning: Prior to testing, remove all control power fusing and connections to products, which will be damaged in this test

Check mark

Select all components that were disconnected prior to testing

Run this procedureArrow right

Ventilation Maintenance

Check mark

Check all grills and ventilation ports for obstructions and accumulations of dirt

Check mark

Clean ventilation ports, if necessary

Check mark

For switchboards installed outdoors, inspect the air space under the switchboard to be sure that it is clean and clear of debris, leaves, and obstructions

Check mark

Sign off on the ventilation maintenance

Run this procedureArrow right

Fusible Overcurrent Device Inspection

Check mark

Switching mechanism and fuse connections visually inspected

Check mark

Fusible devices visually inspected for signs of discoloration, cracking, scorching, overheating, or broken parts

Check mark

Any worn parts or the entire switch replaced

Check mark

Sign off on the fusible overcurrent device inspection

Run this procedureArrow right

Bus and Cable Connection Inspection

Check mark

Inspect bus bar and cables for visible damage

Check mark

Visually inspect connections for overheating and damage

Check mark

All bus bar and cable connections checked and torqued in accordance with labeling on the switchboard

Check mark

Inspect for broken wire strands and pinched or damaged insulation on cable connections

Check mark

Sign off on the inspection

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Eaton

Explore Other Assets