MaintainX Logo
EnterprisePricing
Eaton

Eaton Distribution Panel PRL2A

Need answers fast?
Explore the manual using AI.

Eaton Distribution Panel PRL2A
Eaton Distribution Panel PRL2A

The Eaton Distribution Panel PRL2A is a robust electrical distribution solution designed for efficient power management in industrial settings. This panel ensures reliable operation and safety, making it ideal for various applications requiring dependable electrical distribution.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Eaton Distribution Panel PRL2A

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Eaton Distribution Panel PRL2A

Eaton Distribution Panel PRL2A

Create an account to install this asset package.

Maintenance Plans for Eaton Distribution Panel Model PRL2A

Integrate maintenance plans directly into your work orders in MaintainX.

Insulation Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

Visual check for damage on bus bar and structure insulation

Check mark

List of damaged parts

Check mark

Upload a photo of the damaged parts

Check mark

Insulation material dry and clean

Check mark

Sign off on the insulation maintenance

Run this procedureArrow right

Bus and Cable Connection Inspection

Check mark

Inspect bus bar and cables for visible damage

Check mark

Visually inspect connections for overheating and damage

Check mark

All bus bar and cable connections checked and torqued in accordance with labeling on the switchboard

Check mark

Inspect for broken wire strands and pinched or damaged insulation on cable connections

Check mark

Sign off on the inspection

Run this procedureArrow right

Circuit Breaker Inspection

Check mark

Visual inspection for signs of discoloration, cracking, scorching, overheating, or broken parts

Check mark

Exercise the breaker operating mechanism, making sure it is opening and closing

Check mark

Breaker showing signs of any one of these issues

Check mark

If any issues are found, the breaker should be replaced

Run this procedureArrow right

Secondary Wiring Check

Check mark

- Check all wiring connections for tightness, including those at the current and potential transformers, if present, and at all terminal blocks

Check mark

- Check all secondary wiring connections to ensure that they are properly connected to the switchboard ground bus, where indicated

Check mark

- Look for broken wire strands and pinched or damaged insulation;

Run this procedureArrow right

Fusible Overcurrent Device Inspection

Check mark

Switching mechanism and fuse connections visually inspected

Check mark

Fusible devices visually inspected for signs of discoloration, cracking, scorching, overheating, or broken parts

Check mark

Any worn parts or the entire switch replaced

Check mark

Sign off on the fusible overcurrent device inspection

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Eaton

Explore Other Assets