Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Eaton Distribution Panel PRL2A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Circuit Breaker Inspection
Visual inspection for signs of discoloration, cracking, scorching, overheating, or broken parts
Exercise the breaker operating mechanism, making sure it is opening and closing
Breaker showing signs of any one of these issues
If any issues are found, the breaker should be replaced
1 Year Cleaning
Warning: Ensure the switchboard is de-energized before starting the cleaning process
Dust and debris removed from bus bars, connections, supports, and enclosure surfaces
Switchboard wiped clean with a lint-free cloth
Warning: Do not use solvents to clean equipment, as damage to surfaces can occur
Was the switchboard exposed to adverse conditions, such as airborne contaminants?
Warning: Do not use compressed air in cleaning
Second Megger or DC test of the switchboard insulation between phases and ground performed
Warning: Prior to testing, remove all control power fusing and connections to products, which will be damaged in this test
Select all components that were disconnected prior to testing
Ventilation Maintenance
Check all grills and ventilation ports for obstructions and accumulations of dirt
Clean ventilation ports, if necessary
For switchboards installed outdoors, inspect the air space under the switchboard to be sure that it is clean and clear of debris, leaves, and obstructions
Sign off on the ventilation maintenance
Fusible Overcurrent Device Inspection
Switching mechanism and fuse connections visually inspected
Fusible devices visually inspected for signs of discoloration, cracking, scorching, overheating, or broken parts
Any worn parts or the entire switch replaced
Sign off on the fusible overcurrent device inspection
Bus and Cable Connection Inspection
Inspect bus bar and cables for visible damage
Visually inspect connections for overheating and damage
All bus bar and cable connections checked and torqued in accordance with labeling on the switchboard
Inspect for broken wire strands and pinched or damaged insulation on cable connections
Sign off on the inspection
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX