MaintainX, an Autodesk company
EnterprisePricing
Daikin

Daikin Split System Air Conditioner FCAG35AVEB

Need answers fast?
Explore the manual using AI.

Daikin Split System Air Conditioner FCAG35AVEB
Daikin Split System Air Conditioner FCAG35AVEB

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Split System Air Conditioner FCAG35AVEB

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Split System Air Conditioner FCAG35AVEB

Daikin Split System Air Conditioner FCAG35AVEB

Create an account to install this asset package.

Maintenance Plans for Daikin Split System Air Conditioner Model FCAG35AVEB

Integrate maintenance plans directly into your work orders in MaintainX.

Air Outlet Cleaning

Check mark

WARNING: Do NOT let the indoor unit get wet. Possible consequence: Electric shock or fire.

Check mark

Precautions

Check mark

Do NOT use gasoline, benzene, thinner polishing powder or liquid insecticide.

Check mark

Do NOT use water or air of 50°C or higher.

Check mark

Do NOT scrub firmly when washing the blade with water.

Check mark

Cleaning Instructions

Check mark

Clean with a soft cloth.

Check mark

If stains are difficult to remove, use water or neutral detergent.

Run this procedureArrow right

25000 Hourly User Interface / Switches Maintenance

Check mark

Pre-Maintenance Considerations

Check mark

Acknowledge that maintenance cycles do not relate to warranty period

Check mark

Ensure normal use conditions are met (max 6 starts/stops per hour)

Check mark

Verify operation time is within 10 hours/day and 2,500 hours/year

Check mark

Replacement of User Interface and Switches

Check mark

Replace User Interface

Check mark

Replace Switches

Check mark

Post-Maintenance Considerations

Check mark

Review maintenance and inspection contract for detailed component information

Run this procedureArrow right

5 Yearly Heat Exchanger Maintenance

Check mark

Pre-Maintenance Considerations

Check mark

Ensure the unit has not been started or stopped more than 6 times/hour

Check mark

Verify operation of the unit is within 10 hours/day and 2,500 hours/year

Check mark

Heat Exchanger Replacement

Check mark

Replace the heat exchanger

Check mark

Post-Maintenance Review

Check mark

Is the maintenance cycle in line with the maintenance and inspection contract?

Check mark

Notes on any deviations from recommended maintenance intervals

Run this procedureArrow right

5 Yearly Sensor Maintenance

Check mark

Pre-Maintenance Considerations

Check mark

Ensure the unit has not been started or stopped more than 6 times/hour

Check mark

Verify the unit operates 10 hours/day and 2,500 hours/year

Check mark

Sensor Replacement

Check mark

Replace the thermistor sensor

Check mark

Replace any other sensors as required

Check mark

Post-Maintenance Review

Check mark

Is the maintenance and inspection contract reviewed for updated cycles?

Check mark

Notes on any additional maintenance required sooner than recommended intervals

Run this procedureArrow right

20000 Hourly Electric Motor Maintenance

Check mark

Pre-Maintenance Checks

Check mark

Ensure the motor is powered off and locked out

Check mark

Verify that all safety equipment is in place

Check mark

Motor Replacement

Check mark

Remove the old electric motor

Check mark

Install the new electric motor

Check mark

Post-Maintenance Verification

Check mark

Is the motor operating smoothly after replacement?

Check mark

Check for any unusual noises or vibrations

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets