

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Split System Air Conditioner FCAG35AVEB
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Air Outlet Cleaning
WARNING: Do NOT let the indoor unit get wet. Possible consequence: Electric shock or fire.
Precautions
Do NOT use gasoline, benzene, thinner polishing powder or liquid insecticide.
Do NOT use water or air of 50°C or higher.
Do NOT scrub firmly when washing the blade with water.
Cleaning Instructions
Clean with a soft cloth.
If stains are difficult to remove, use water or neutral detergent.
25000 Hourly User Interface / Switches Maintenance
Pre-Maintenance Considerations
Acknowledge that maintenance cycles do not relate to warranty period
Ensure normal use conditions are met (max 6 starts/stops per hour)
Verify operation time is within 10 hours/day and 2,500 hours/year
Replacement of User Interface and Switches
Replace User Interface
Replace Switches
Post-Maintenance Considerations
Review maintenance and inspection contract for detailed component information
5 Yearly Heat Exchanger Maintenance
Pre-Maintenance Considerations
Ensure the unit has not been started or stopped more than 6 times/hour
Verify operation of the unit is within 10 hours/day and 2,500 hours/year
Heat Exchanger Replacement
Replace the heat exchanger
Post-Maintenance Review
Is the maintenance cycle in line with the maintenance and inspection contract?
Notes on any deviations from recommended maintenance intervals
5 Yearly Sensor Maintenance
Pre-Maintenance Considerations
Ensure the unit has not been started or stopped more than 6 times/hour
Verify the unit operates 10 hours/day and 2,500 hours/year
Sensor Replacement
Replace the thermistor sensor
Replace any other sensors as required
Post-Maintenance Review
Is the maintenance and inspection contract reviewed for updated cycles?
Notes on any additional maintenance required sooner than recommended intervals
20000 Hourly Electric Motor Maintenance
Pre-Maintenance Checks
Ensure the motor is powered off and locked out
Verify that all safety equipment is in place
Motor Replacement
Remove the old electric motor
Install the new electric motor
Post-Maintenance Verification
Is the motor operating smoothly after replacement?
Check for any unusual noises or vibrations
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













