MaintainX, an Autodesk company
EnterprisePricing
Daikin

Daikin Outdoor Heat Pump RXS50J2V1B9

Need answers fast?
Explore the manual using AI.

Daikin Outdoor Heat Pump RXS50J2V1B9
Daikin Outdoor Heat Pump RXS50J2V1B9

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Outdoor Heat Pump RXS50J2V1B9

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Outdoor Heat Pump RXS50J2V1B9

Daikin Outdoor Heat Pump RXS50J2V1B9

Create an account to install this asset package.

Maintenance Plans for Daikin Outdoor Heat Pump Model RXS50J2V1B9

Integrate maintenance plans directly into your work orders in MaintainX.

Electrical Box Removal

Check mark

Warning: Wait for 10 minutes after turning off all power supplies before disassembling work.

Check mark

Protection Plate and Wire Fixture Removal

Check mark

Remove the 2 screws and remove the protection plate.

Check mark

Remove the 3 screws and remove the wire fixture.

Check mark

Wire and Panel Disassembly

Check mark

Remove the 7 screws and remove the connecting wire and the power supply wire.

Check mark

Remove the 2 screws and remove the earth / ground wire.

Check mark

Pull out the outdoor temperature thermistor.

Check mark

Remove the 4 screws of the right side panel.

Run this procedureArrow right

Compressor Removal

Check mark

Safety Precautions

Check mark

Wait for 10 minutes after turning off all power supplies before starting disassembly.

Check mark

Ensure pipes and parts heated by the gas brazing machine are cool to avoid burns.

Check mark

Is the room ventilated in case of refrigerant gas leakage?

Check mark

Prepare wet cloth to extinguish fire in case refrigerant oil catches fire.

Check mark

Environmental and Safety Cautions

Check mark

Collect all refrigerant gas to avoid atmospheric discharge.

Check mark

Restore piping using non-oxidation brazing.

Check mark

Preparation Notes

Run this procedureArrow right

Outdoor Fan / Fan Motor Removal

Check mark

Safety Precautions

Check mark

Wait for 10 minutes or more after turning off all power supplies before disassembling work.

Check mark

Disassembly Steps

Check mark

Remove the shield plate.

Check mark

Disconnect the connector [S70] for the fan motor.

Check mark

Release the clamp from the partition plate.

Check mark

Release the fan motor lead wire from the groove and the 2 hooks of the partition plate.

Check mark

Remove the nut and remove the outdoor fan.

Check mark

Remove the 2 screws of the fan motor fixing frame.

Run this procedureArrow right

PCB Removal

Check mark

Safety Precaution

Check mark

Wait for 10 minutes or more after turning off all power supplies before disassembling work.

Check mark

Remove the Main PCB

Check mark

Disconnect the following connectors and pull out the clamps

Check mark

Remove the following screws

Check mark

Lift the main PCB ASSY.

Check mark

Unfasten the 4 hooks at the bottom.

Check mark

Remove the 8 screws.

Check mark

Unfasten the 2 hooks and remove the main PCB.

Run this procedureArrow right

Four Way Valve / Electronic Expansion Valve Removal

Check mark

Safety Precautions

Check mark

Wait for 10 minutes after turning off all power supplies before starting disassembly work.

Check mark

Ensure proper ventilation if refrigerant gas leaks during work.

Check mark

Collect all refrigerant gas to prevent atmospheric discharge.

Check mark

Preparation

Check mark

Ensure refrigerant gas is empty in the circuit.

Check mark

Apply nitrogen replacement when heating up the brazed part.

Check mark

Provide a protective sheet or steel plate to shield peripheries from brazing flame.

Check mark

Four Way Valve Removal

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets