

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Cooling-Only Outdoor Unit RKS18JV2S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Four Way Valve / Electronic Expansion Valve Removal
Safety Precautions
Wait for 10 minutes or more after turning off all power supplies before disassembling work.
Ensure proper ventilation if refrigerant gas leaks during work.
Collect all refrigerant gas to prevent atmospheric discharge.
Preparation
Ensure refrigerant gas is empty in the circuit.
Apply nitrogen replacement when heating up the brazed part.
Provide a protective sheet or steel plate to shield peripheries from brazing flame.
Four Way Valve Removal
Electrical Box Removal
Warning: Wait for 10 minutes after turning off all power supplies before disassembling work.
Protection Plate and Wire Fixture Removal
Remove the 2 screws and remove the protection plate.
Remove the 3 screws and remove the wire fixture.
Wire and Panel Disassembly
Remove the 7 screws and remove the connecting wire and the power supply wire.
Remove the 2 screws and remove the earth / ground wire.
Pull out the outdoor temperature thermistor.
Remove the 4 screws of the right side panel.
Outer Panel Removal
Warning: Wait for 10 minutes or more after turning off all power supplies before disassembling work.
Remove the top panel
Remove the 4 screws from the top panel
Remove the top panel
Remove the discharge grille
Remove the 4 screws from the discharge grille
Slide the discharge grille upward and remove it
Check for hooks on the discharge grille
Remove the front panel
Compressor Removal
Safety Precautions
Wait for 10 minutes after turning off all power supplies before starting disassembly.
Ensure pipes and parts heated by the gas brazing machine are cool to avoid burns.
Is the room ventilated in case of refrigerant gas leakage?
Prepare wet cloth to extinguish fire in case refrigerant oil catches fire.
Environmental and Safety Cautions
Collect all refrigerant gas to avoid atmospheric discharge.
Restore piping using non-oxidation brazing.
Preparation Notes
PCB Removal
Pre-removal Safety Check
Ensure all power supplies are turned off for at least 10 minutes before starting disassembly.
Main PCB Removal
Remove the main PCB [S12] for [HL4] [HN4] on filter.
Disconnect the PCB connector [S12] and pull out the clamp.
Disconnect the connector [S10] for [S11] on filter PCB.
Pull out the clamp. When reassembling, insert the clamp as below.
Disconnect the connectors [HN3] [HL3] for [HL2] and [HN2] on filter PCB.
Pull out the clamp. When reassembling, insert the clamp as below.
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













