MaintainX, an Autodesk company
EnterprisePricing
Daikin

Daikin Outdoor Heat Pump 3MXS68G3V1B

Need answers fast?
Explore the manual using AI.

Daikin Outdoor Heat Pump 3MXS68G3V1B
Daikin Outdoor Heat Pump 3MXS68G3V1B

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Outdoor Heat Pump 3MXS68G3V1B

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Outdoor Heat Pump 3MXS68G3V1B

Daikin Outdoor Heat Pump 3MXS68G3V1B

Create an account to install this asset package.

Maintenance Plans for Daikin Outdoor Heat Pump Model 3MXS68G3V1B

Integrate maintenance plans directly into your work orders in MaintainX.

Coil / Thermistor Removal

Check mark

Warning: Wait for 10 minutes or more after turning off all power supplies before disassembling work.

Check mark

Remove electronic expansion valve coils

Check mark

Remove the screw and four way valve coil

Check mark

Cooling only models have no four way valve coil

Check mark

Open the putty and remove the liquid pipe thermistors

Check mark

Pull out the gas pipe thermistors

Check mark

Be careful not to lose the clip

Check mark

Cut the clamp

Check mark

Pull out the outdoor heat exchanger thermistor

Run this procedureArrow right

Four Way Valve Removal

Check mark

Safety Precautions

Check mark

Wait for 10 minutes after turning off all power supplies before starting disassembly.

Check mark

Ensure pipes and parts heated by the gas brazing machine are cool to avoid burns.

Check mark

Is the room ventilated in case of refrigerant gas leakage?

Check mark

Collect all refrigerant gas to prevent atmospheric discharge.

Check mark

Preparation

Check mark

Ensure refrigerant gas is empty in the circuit.

Check mark

Apply nitrogen replacement when heating the brazed part.

Check mark

Provide a protective sheet or steel plate to shield peripheries from brazing flame.

Run this procedureArrow right

PCB Removal

Check mark

Warning: Wait for 10 minutes after turning off all power supplies before disassembling work.

Check mark

Remove the service monitor PCB

Check mark

Disconnect the connectors from the service monitor PCB

Check mark

Unfasten the upper hook and remove the service monitor PCB

Check mark

Remove the main PCB

Check mark

Remove the screw of the terminal board and open it

Check mark

Disconnect the connectors for the terminal board on the right side

Check mark

Disconnect the connectors for the reactor on the left side

Check mark

Remove the screws of the main PCB

Run this procedureArrow right

Electrical Box Removal

Check mark

Warning: Wait for 10 minutes after turning off all power supplies before disassembling work.

Check mark

Disconnect the harnesses

Check mark

Peel off the fixing tape.

Check mark

Unfasten the 4 hooks and remove the electrical box cover.

Check mark

Detach the clamp and disconnect the connector [S70].

Check mark

Release the fan motor core for the harness of [S70].

Check mark

Disconnect the connectors for the electronic expansion valve coil.

Check mark

Pull out the clamp.

Check mark

Disconnect the connector [S40].

Run this procedureArrow right

Distributor Removal

Check mark

Safety Precautions

Check mark

Wait for 10 minutes after turning off all power supplies before starting disassembly.

Check mark

Ensure no contact with heated pipes and parts from the gas brazing machine.

Check mark

Is the room ventilated in case of refrigerant gas leakage?

Check mark

Environmental Protection

Check mark

Collect all refrigerant gas to prevent atmospheric discharge.

Check mark

Restore piping using non-oxidation brazing.

Check mark

Preparation

Check mark

Ensure refrigerant gas is empty in the circuit.

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets