Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Outdoor Heat Pump 4MXS68F3V1B
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Coil / Thermistor Removal
Warning: Wait for 10 minutes or more after turning off all power supplies before disassembling work.
Remove electronic expansion valve coils
Remove the screw and the four way valve coil
Check if the model is cooling only (no four way valve coil)
Open the putty and remove the liquid pipe thermistors
Pull out the gas pipe thermistors
Cut the clamp
Pull out the outdoor heat exchanger thermistor
Remove the discharge pipe thermistor
Four Way Valve Removal
Safety Precautions
Wait for 10 minutes after turning off all power supplies before starting disassembly.
Ensure pipes and parts heated by the gas brazing machine are cool to avoid burns.
Is the room ventilated in case of refrigerant gas leakage?
Environmental Cautions
Collect all refrigerant gas to prevent atmospheric discharge.
Cautions for Restoration
Restore piping using non-oxidation brazing.
Wrap the four way valve with wet cloth and keep it below 120°C (248°F) to prevent oil carbonization and gasket deterioration.
Electrical Box Removal
Warning
Disconnect the harnesses
Peel off the fixing tape.
Unfasten the hooks and remove the electrical box cover.
Detach the clamp and disconnect the connector [S70].
Release the fan motor core for the harness of [S70].
Disconnect the connectors for the electronic expansion valve coil.
Pull out the clamp.
Disconnect the connector [S40].
Sound Blanket Removal
Pre-removal Warning
Ensure all power supplies are turned off for at least 10 minutes before starting disassembly.
Remove the Right Side Panel
Remove screws from the right side panel
Remove the protection rubber. Note: There is a hook on the back.
Lift up and remove the right side panel.
Remove the Partition Plate
Remove the 2 screws of the partition plate.
Detach the clamp of the relay harness for the compressor.
PCB Removal
Warning: Wait for 10 minutes after turning off all power supplies before disassembling work.
Remove the service monitor PCB
Disconnect the connectors from the service monitor PCB
Unfasten the upper hook and remove the service monitor PCB
Remove the main PCB
Remove the screw of the terminal board and open it
Disconnect the connectors for the terminal board on the right side
Disconnect the connectors for the reactor on the left side
Remove the screws of the main PCB
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX