

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Outdoor Heat Pump 3MXS68LVMA9
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Coil / Thermistor Removal
Warning: Wait for 10 minutes or more after turning off all power supplies before disassembling work.
Pull out the electronic expansion valve coils.
Remove the screw and remove the four way valve coil.
Cooling only models have no four way valve coil.
Open the putty and remove the liquid pipe thermistors.
When reassembling, meet the edge of the thermistor and the fixture.
Pull out the gas pipe thermistors.
Be careful not to lose the clip.
The positions of the clamp and outdoor heat exchanger thermistor differ depending on the model.
Sound Blanket Removal
Pre-removal Warning
Wait for 10 minutes or more after turning off all power supplies before disassembling work.
Remove the right side panel
Remove the screws of the right side panel
Remove the protection rubber
Lift up and remove the right side panel
Remove the partition plate
Remove the 2 screws of the partition plate
Detach the clamp of the relay harness for the compressor
Compressor Removal
Safety Precautions
Wait for 10 minutes after turning off all power supplies before disassembling work.
Ensure no burns from heated pipes and parts.
Ventilate the room if refrigerant gas leaks during work.
Prepare wet cloth to extinguish fire immediately if refrigerant oil catches fire.
Environmental and Safety Cautions
Do not discharge refrigerant gas into the atmosphere. Collect all refrigerant gas.
Restore piping by non-oxidation brazing.
Preparation Notes
Four Way Valve Removal
Safety Precautions
Wait for 10 minutes or more after turning off all power supplies before disassembling work.
Ensure pipes and other parts heated by the gas brazing machine are cool to avoid burns.
Is the room ventilated in case of refrigerant gas leak?
Collect all refrigerant gas to prevent atmospheric discharge.
Preparation
Ensure refrigerant gas is empty in the circuit.
Apply nitrogen replacement when heating up the brazed part.
Provide a protective sheet or steel plate to shield peripheries from brazing flame.
Electrical Box Removal
Warning: Wait for 10 minutes after turning off all power supplies before disassembling work.
Disconnect the harnesses
Peel off the fixing tape.
Unfasten the hooks and remove the electrical box cover.
Detach the clamp and disconnect the connector [S70].
Release the fan motor core for the harness of [S70].
Disconnect the connectors for the electronic expansion valve coil.
Pull out the clamp.
Disconnect the connector [S40].
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













