

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Outdoor Heat Pump 3MKS68LVMA
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Coil / Thermistor Removal
Warning: Wait for 10 minutes after turning off all power supplies before disassembling work.
Pull out the electronic expansion valve coils.
Remove the screw and remove the four way valve coil.
Cooling only models have no four way valve coil.
Open the putty and remove the liquid pipe thermistors.
When reassembling, meet the edge of the thermistor and the fixture.
Pull out the gas pipe thermistors.
Be careful not to lose the clip.
The positions of the clamp and outdoor heat exchanger thermistor differ depending on the model.
Outer Panel Removal
Warning: Wait for 10 minutes or more after turning off all power supplies before disassembling work.
Remove the top panel
Remove the 4 screws from the top panel
Remove the top panel
Remove the front panel
Remove the 6 screws from the front panel
Unfasten the 4 hooks from the front panel
Remove the front panel
Remove the shield plate
Four Way Valve Removal
Safety Precautions
Wait for 10 minutes after turning off all power supplies before starting disassembly.
Ensure pipes and parts heated by the gas brazing machine are cool to avoid burns.
Is the room ventilated in case of refrigerant gas leakage?
Collect all refrigerant gas to prevent atmospheric discharge.
Preparation
Ensure refrigerant gas is empty in the circuit.
Apply nitrogen replacement when heating the brazed part.
Provide a protective sheet or steel plate to shield peripheries from brazing flame.
PCB Removal
Warning: Wait for 10 minutes after turning off all power supplies before disassembling work.
Remove the service monitor PCB
Disconnect the connectors from the service monitor PCB
Unfasten the upper hook and remove the service monitor PCB
Remove the main PCB
Remove the screw of the terminal board and open it
Disconnect the connectors for the terminal board on the right side
Disconnect the 2 connectors for the reactor on the left side
Remove the 3 screws of the main PCB
Distributor Removal
Safety Precautions
Wait for 10 minutes after turning off all power supplies before starting disassembly.
Ensure no contact with heated pipes and parts from the gas brazing machine.
Is the room ventilated in case of refrigerant gas leakage?
Collect all refrigerant gas to prevent atmospheric discharge.
Preparation
Ensure refrigerant gas is empty in the circuit.
Apply nitrogen replacement when heating the brazed part.
Avoid using a metal saw for cutting pipes.
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













