

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

condair Steam Humidifier RS-20
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Steam Humidifier Maintenance
Small Maintenance
Inspect and clean components if necessary
Inspect and replace defective hoses if necessary
Check supply pipe is tight and tighten if necessary
Clean water filter, if available
Extended Maintenance
Scale collector tank: Remove and clean
Connection ring scale collector tank: Inspect and replace if necessary
Steam cylinder: Remove, disassemble and clean, replace defective components if necessary
Control Unit Fuse And Backup Battery Replacement
Preparation
Disconnect control unit from the mains by switching off the electrical isolator and secure electrical isolator in 'Off' position against inadvertent switching on.
Unlock the front cover of the steam humidifier and remove it (for large units with two front covers: remove the front cover on the control compartment side).
Fuse and Battery Replacement
Swivel control board assembly 90° outwards.
Replace desired component
Ensure the contact protection of fuse 'F2' is relocated after the fuse has been replaced.
Reassembly
Swivel control board assembly 90° inwards.
5 Yearly Contactor Replacement
Pre-Replacement Checks
Has the warning for contactor replacement appeared?
Verify that the contactors are due for replacement (5 years since last replacement).
Replacement Process
Ensure the power supply is turned off before starting the replacement.
Confirm the following tools are available
Replace the contactors with new ones purchased from Condair.
Post-Replacement Verification
Check if the new contactors are functioning correctly.
1 Yearly Steam Humidifier Maintenance
Personnel Qualification and Safety
Verify personnel qualification and authorization
Ensure all maintenance instructions are followed
Use only original Condair spare parts
Switch off the unit, disconnect from mains, and stop water supply
Secure the unit against inadvertent power-up
Implement ESD protection measures
Wait for components to cool down to prevent burns
Maintenance Intervals and Counters
Steam Humidifier Cleaning
Scale Collector Tank
Dump any lime in scale collector tank
Remove limescale inside scale collector tank and on the strainer insert using a soft bristled brush
Wash scale collector tank with lukewarm soap solution and rinse with tap water
Connection Ring Scale Collector Tank
Wipe off any limescale with a damp cloth without detergent
Check the connection ring for cracks and replace if necessary
Steam Cylinder / Steam Cylinder Insert
Remove limescale using a soft bristled brush
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













