Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Bitzer Refrigeration Liquid Receiver FS2202
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Sight Glass Cleaning
Safety Precautions
Wear safety goggles
Wear cold-protective gloves
Handling Used Oil
Pack used oil safely
Dispose of used oil in an environmentally friendly manner
Mark vessels with warning signs
Extracting the Refrigerant
Switch off the refrigeration system
Initial Refrigerant Charging Maintenance
6.3 Charging refrigerant
Ensure no components or pipes are completely charged with liquid refrigerant
Verify sufficient volume is left above the liquids
Confirm only permitted refrigerants are used
Measure out extremely precise quantities of refrigerant
Ensure oil temperature is above 40°C
Charge the condenser or receiver directly with liquid refrigerant
Ensure blends are taken out of the charging cylinder as a bubble-free liquid
Add refrigerant on the suction side while the compressor is running, preferably at the evaporator inlet
Initial Accessory Maintenance
4.7 Mounting included accessory
Have the oil pan ready.
Fit the accessories best before commissioning.
Check connection positions for the included accessory in chapter Connections, page 38.
Check tightening torques of screws in chapter Mind when mounting or replacing, page 54 and following chapters.
After mounting, check pressure equipment for tightness.
In the case of retrofitting
Shut off all inlets and outlets of the pressure equipment into which something is to be installed.
Depressurise the pressure equipment.
Compressor Start-up Check
6.4 Compressor start
6.4.1 Vibrations
Check for abnormal vibrations in the system, particularly the pipelines and capillary tubes.
Were additional safety measures required due to vibrations?
Ensure no strong vibrations are present to avoid risk of burst pipes and leakages.
Connect the pipes to the pressure equipment without load and stress to prevent mechanical stress.
Receiver Leak Testing
6 Commissioning
Verify factory testing of pressure equipment
Test tightness of connections and pipe works
6.1 Testing tightness
Test refrigerant circuit for tightness according to EN378-2 or equivalent standards
Enter the overpressure applied during the test
Is the test pressure within the maximum allowable values?
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX