

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Bitzer Refrigeration Liquid Receiver FS902
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Compressor Start-up Check
6.4 Compressor start
6.4.1 Vibrations
Check for abnormal vibrations in the system, particularly the pipelines and capillary tubes.
Were additional safety measures required due to vibrations?
Ensure pipes are connected to the pressure equipment without load and stress to prevent mechanical stress.
Receiver Leak Testing
6 Commissioning
Verify factory testing of pressure equipment
Test tightness of connections and pipe works after installation
6.1 Testing tightness
Test refrigerant circuit for tightness according to EN378-2 or equivalent standards
Enter the overpressure applied using dry nitrogen
Ensure test pressure does not exceed 1.1-fold of the maximum allowable pressure
Enter the maximum allowable pressure from the name plate
Sight Glass Cleaning
Safety Precautions
Wear safety goggles
Wear cold-protective gloves
Handling Used Oil
Pack used oil safely
Dispose of used oil in an environmentally friendly manner
Fill used oil into pressure resistant vessels
Fill vessels with nitrogen as a protective gas and close them
Mark vessels with the warning sign 'flammable substance' W021 from ISO7010
Initial System Vacuum Check
6.2 Evacuation
Switch on the oil heater
Open all shut-off valves and solenoid valves
Use a vacuum pump to evacuate the entire system, including the compressor, on the suction side and the high pressure side
Check if a 'standing vacuum' lower than 1.5 mbar is achieved with the vacuum pump shut off
Repeat the evacuation operation if necessary
Risk of damage to the motor and compressor: Do not start the compressor while it is in a vacuum! Do not apply any voltage, not even for testing!
Initial Refrigerant Charging Maintenance
6.3 Charging refrigerant
Ensure no components or pipes are completely charged with liquid refrigerant
Verify sufficient volume is left above the liquids
Confirm only permitted refrigerants are used
Measure the precise quantity of liquid refrigerant to be charged
Check that the oil temperature is above 40°C
Charge the condenser or receiver directly with liquid refrigerant
Ensure blends are taken out of the charging cylinder as a bubble-free liquid
If necessary, add refrigerant while the compressor is running, charging on the suction side, preferably at the evaporator inlet
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













