Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Bitzer Refrigeration Liquid Receiver FS76
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Receiver Leak Testing
6 Commissioning
Verify factory testing of pressure equipment
Test tightness of connections and pipe works
6.1 Testing tightness
Test refrigerant circuit for tightness according to EN378-2 or equivalent standards
Enter the overpressure applied during the test
Is the test pressure within the maximum allowable values?
Initial Accessory Maintenance
4.7 Mounting included accessory
Have the oil pan ready.
Fit the accessories best before commissioning.
Connection positions for the included accessory, see chapter Connections, page 38, above.
Tightening torques of screws see chapter Mind when mounting or replacing, page 54 and following chapters.
Check pressure equipment for tightness after mounting.
In the case of retrofitting
Shut off all inlets and outlets of the pressure equipment into which something is to be installed.
Depressurise the pressure equipment.
Sight Glass Cleaning
Safety Precautions
Wear safety goggles
Wear cold-protective gloves
Handling Flammable Refrigerants
Pack used oil safely
Dispose of used oil in an environmentally friendly manner
Fill used oil into pressure resistant vessels
Fill vessels with nitrogen as a protective gas and close them
Mark vessels with the warning sign 'flammable substance' W021 from ISO7010
Compressor Start-up Check
6.4 Compressor start
6.4.1 Vibrations
Check for abnormal vibrations in the whole system, particularly the pipelines and capillary tubes.
Were additional safety measures required due to vibrations?
Ensure no strong vibrations are present to avoid risk of burst pipes and leakages.
Connect the pipes to the pressure equipment without load and stress to prevent mechanical stress.
Initial Refrigerant Charging Maintenance
6.3 Charging refrigerant
Check for blocked components and pipes
Ensure sufficient volume above the liquids
Verify use of permitted refrigerants
Measure out precise quantities of refrigerant
Keep the oil temperature above 40°C
Charge the condenser or receiver directly with liquid refrigerant
Ensure blends are taken out of the charging cylinder as a bubble-free liquid
Add refrigerant on the suction side while the compressor is running
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX