Bitzer Refrigeration Liquid Receiver FS152

Need answers fast?
Explore the manual using AI.

Bitzer Refrigeration Liquid Receiver FS152
Bitzer Refrigeration Liquid Receiver FS152

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Bitzer Refrigeration Liquid Receiver FS152

Bitzer Refrigeration Liquid Receiver FS152

Create an account to install this asset package.

Maintenance Plans for Bitzer Refrigeration Liquid Receiver Model FS152

Integrate maintenance plans directly into your work orders in MaintainX.

Initial System Vacuum Check

Check mark

6.2 Evacuation

Check mark

Switch on the oil heater

Check mark

Open all shut-off valves and solenoid valves

Check mark

Use a vacuum pump to evacuate the entire system, including the compressor, on the suction side and the high pressure side

Check mark

Measure the standing vacuum achieved

Check mark

Is the standing vacuum lower than 1.5 mbar?

Check mark

Repeat the evacuation operation if necessary

Check mark

Ensure the compressor is not started while in a vacuum

Check mark

Ensure no voltage is applied to the compressor

Run this procedureArrow right

Compressor Start-up Check

Check mark

6.4 Compressor start

Check mark

6.4.1 Vibrations

Check mark

Check for abnormal vibrations in the system, particularly the pipelines and capillary tubes

Check mark

Take additional safety measures if abnormal vibrations are detected

Check mark

Ensure pipes are connected to the pressure equipment without load and stress

Run this procedureArrow right

Receiver Leak Testing

Check mark

6 Commissioning

Check mark

Verify factory testing of pressure equipment

Check mark

Test tightness of connections and pipe works

Check mark

6.1 Testing tightness

Check mark

Test refrigerant circuit for tightness according to EN378-2 or equivalent standards

Check mark

Enter the overpressure applied during the test

Check mark

Was dry nitrogen used for creating overpressure?

Check mark

Enter the maximum allowable pressure from the name plate

Check mark

Calculate and enter the test pressure (1.1-fold of the maximum allowable pressure)

Run this procedureArrow right

Initial Refrigerant Charging Maintenance

Check mark

6.3 Charging refrigerant

Check mark

Ensure no components or pipes are completely charged with liquid refrigerant

Check mark

Verify sufficient volume is left above the liquids

Check mark

Confirm only permitted refrigerants are used

Check mark

Measure out extremely precise quantities of refrigerant

Check mark

Record the oil temperature

Check mark

Charge the condenser or receiver directly with liquid refrigerant

Check mark

Ensure blends are taken out of the charging cylinder as a bubble-free liquid

Check mark

If necessary, add refrigerant while the compressor is running, charging on the suction side, preferably at the evaporator inlet

Run this procedureArrow right

Sight Glass Cleaning

Check mark

Safety Precautions

Check mark

Wear safety goggles

Check mark

Wear cold-protective gloves

Check mark

Handling Used Oil

Check mark

Pack used oil safely

Check mark

Dispose of used oil in an environmentally friendly manner

Check mark

Fill used oil into pressure resistant vessels

Check mark

Fill vessels with nitrogen as a protective gas and close them

Check mark

Mark vessels with the warning sign 'flammable substance' W021 from ISO7010

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Bitzer

Explore Other Assets