Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Conair Thermolator Temperature Control Unit IC-12kW-208V
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Cooling and Process Lines Check
Inspection of Cooling and Process Lines
Inspect the following for leaks
Were any leaks detected during inspection?
Action on Leak Detection
Stop the Thermolator if a leak is detected
Describe the location and nature of the leak
Repair the leak
Thermocouple Replacement
Preparation
Disconnect and lockout the main power
Shut off the cooling water infeed
Drain the unit using the drain plugs located at the bottom
Access the Thermocouple
Remove the unit’s top panel
Open the electrical enclosure
Remove the Old Thermocouple
Remove the thermocouple
Heater Element Replacement
Power Disconnection and Lockout
Disconnect the main power
Lockout the main power
Panel and Cap Removal
Remove the top panel of the Thermolator
Remove the heater cap
Heater Cap Bolt Removal
Use a 1/4-inch open-end wrench to remove the three bolts holding the cap to the heater tank
Wiring Harness and Layout
1 Monthly Fluid Reservoir Inspection
Initial Inspection
Inspect the fluid reservoir for debris or deposits
Is flushing and cleaning of the reservoir necessary?
Reservoir Filling Procedure
Disconnect and lockout power
Remove the top panel of the Thermolator
Locate the reservoir near the top of the unit
Locate the fill port at the top of the reservoir
Monitor the fluid level using the sight glass on the back of the unit
1 Yearly Unit Testing
Preparation for Test Mode
Shut down the Thermolator
Disconnect and lock out main power to the unit
Open the electrical enclosure
Set dip switches
Close the electrical enclosure
Restore power to the unit
Press any button to display the first test menu
Key/Display Test
Access the parts list for your equipment in MaintainX.
¾ HP Pump Model 11C (With Cast Iron Impeller)
9000952
1 HP Pump Model 11C (With Cast Iron Impeller)
9000953
2 HP Pump Model 12C (With Brass Impeller)
9000954
3 HP Pump Model 50C (With Cast Iron Impeller)
9000955
5 HP Pump Model 50C (With Cast Iron Impeller)
9000956
¾ HP Pump Model 11C (With Cast Iron Impeller)
9000952
1 HP Pump Model 11C (With Cast Iron Impeller)
9000953
2 HP Pump Model 12C (With Brass Impeller)
9000954
3 HP Pump Model 50C (With Cast Iron Impeller)
9000955
5 HP Pump Model 50C (With Cast Iron Impeller)
9000956
¾ HP Pump Model 11C (With Cast Iron Impeller)
9000952
1 HP Pump Model 11C (With Cast Iron Impeller)
9000953
2 HP Pump Model 12C (With Brass Impeller)
9000954
3 HP Pump Model 50C (With Cast Iron Impeller)
9000955
5 HP Pump Model 50C (With Cast Iron Impeller)
9000956
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













