MaintainX, an Autodesk company
EnterprisePricing
Carrier

Carrier Container Refrigeration Unit 69NT40-511-11

Need answers fast?
Explore the manual using AI.

Carrier Container Refrigeration Unit 69NT40-511-11
Carrier Container Refrigeration Unit 69NT40-511-11

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Carrier Container Refrigeration Unit 69NT40-511-11

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Carrier Container Refrigeration Unit 69NT40-511-11

Carrier Container Refrigeration Unit 69NT40-511-11

Create an account to install this asset package.

Maintenance Plans for Carrier Container Refrigeration Unit Model 69NT40-511-11

Integrate maintenance plans directly into your work orders in MaintainX.

High Pressure Switch Check

Check mark

Safety Precautions

Check mark

Ensure a pressure regulator is used with the nitrogen cylinder

Check mark

Ensure no oxygen is present near the refrigeration system

Check mark

Preparation

Check mark

Remove the high pressure switch as outlined in section 6.12.1

Check mark

Connect ohmmeter or continuity light across switch terminals

Check mark

Pressure Test

Check mark

Connect hose to a cylinder of dry nitrogen

Check mark

Open cylinder valve

Run this procedureArrow right

AMBS/DTS Sensors Replacement

Check mark

Power Disconnection

Check mark

Turn unit power OFF

Check mark

Disconnect power supply

Check mark

Wire Preparation

Check mark

Cut wires to 25.4 cm (10 inches) from the back of the mounting stud of the defective sensor and discard.

Check mark

Cut one of the two wires 25.4 mm (1.0 inch) shorter than the other wire.

Check mark

Cut one replacement sensor wire back 25.4 mm (1.0 inch).

Check mark

Strip back insulation on all wiring 6.35mm (1/4 inch).

Check mark

Crimping and Soldering

Run this procedureArrow right

Resistance Thermometer Check

Check mark

Prepare Ice Water Mixture

Check mark

Fill thermos container with ice cubes or chips

Check mark

Fill voids between ice with plain water

Check mark

Stir the solution until it registers 0 to 0.3°C (32 to 32.5°F) on a laboratory thermometer

Check mark

Check Resistance Thermometer Accuracy

Check mark

Immerse the resistance thermometer in the 0°C (32°F) solution

Check mark

Is the recommended length of the check probe immersed?

Check mark

Does the resistance thermometer register 0°C (32°F)?

Check mark

Post-Check Adjustments

Run this procedureArrow right

AMBS/DTS Sensors Check

Check mark

Turn unit OFF

Check mark

Disconnect power supply

Check mark

Refer to section 6.27 for removal of the Controller module

Check mark

Identify the plug connector marked 'EC' connected to the Controller module

Check mark

Locate the wires marked AMBS or DTS

Check mark

Measure the ohms resistance using the pins of the plug

Check mark

Record the ohms resistance readings

Run this procedureArrow right

Compressor Oil Level Check

Check mark

Initial Operation

Check mark

Operate the unit in cooling mode for at least 20 minutes

Check mark

Is there any foaming of the oil in the front oil sight glass after 20 minutes of operation?

Check mark

Oil Level Check

Check mark

Turn unit off to check the oil level

Check mark

Is the oil level between the bottom to one-eighth level of the sight glass?

Check mark

Oil Adjustment

Check mark

Select the action based on oil level

Check mark

Adding Oil with Compressor in System

Run this procedureArrow right

Parts for Carrier Container Refrigeration Unit 69NT40-511-11

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Rupture Disc 1

14-00215-03

Rupture Disc 2

14-00215-04

Manifold Gauge

07-00294-00

Vacuum Pump

07-00176-01

Simpson Meter

07-00013

Rupture Disc 1

14-00215-03

Rupture Disc 2

14-00215-04

Manifold Gauge

07-00294-00

Vacuum Pump

07-00176-01

Simpson Meter

07-00013

Rupture Disc 1

14-00215-03

Rupture Disc 2

14-00215-04

Manifold Gauge

07-00294-00

Vacuum Pump

07-00176-01

Simpson Meter

07-00013

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Carrier

Explore Other Assets