Carrier Container Refrigeration Unit 69NT40-511-5
Carrier Container Refrigeration Unit 69NT40-511-5

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Carrier Container Refrigeration Unit 69NT40-511-5

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Carrier Container Refrigeration Unit 69NT40-511-5

Carrier Container Refrigeration Unit 69NT40-511-5

Create an account to install this asset package.

Maintenance Plans for Carrier Container Refrigeration Unit Model 69NT40-511-5

Integrate maintenance plans directly into your work orders in MaintainX.

AMBS/DTS Sensors Replacement

Check mark

Power Disconnection

Check mark

Turn unit power OFF

Check mark

Disconnect power supply

Check mark

Wire Preparation

Check mark

Cut wires to 25.4 cm (10 inches) from the back of the mounting stud of the defective sensor and discard.

Check mark

Cut one of the two wires 25.4 mm (1.0 inch) shorter than the other wire.

Check mark

Cut one replacement sensor wire back 25.4 mm (1.0 inch).

Check mark

Strip back insulation on all wiring 6.35mm (1/4 inch).

Check mark

Crimping and Soldering

Run this procedureArrow right

AMBS/DTS Sensors Check

Check mark

Preparation

Check mark

Turn unit OFF and disconnect power supply

Check mark

Refer to section 6.27 for removal of the Controller module

Check mark

Sensor Identification and Measurement

Check mark

Identify the sensor type to be checked

Check mark

Measure the ohms resistance using the plug connector marked 'EC'

Check mark

Refer to Table 6-1 for resistance readings

Run this procedureArrow right

Refrigerant Charging

Check mark

Checking the Refrigerant Charge

Check mark

Ensure compliance with environmental laws

Check mark

Set the controller set point to --25_C (--13_F)

Check mark

Ensure the suction modulation valve is fully open

Check mark

Measure container temperature

Check mark

Units with Receiver

Check mark

Connect the gauge manifold to the compressor discharge and suction service valves

Check mark

Partially block the condenser coil inlet air to raise compressor discharge pressure to approximately 12 kg/cm@ (175 psig)

Check mark

Is the refrigerant level between the sight glasses?

Run this procedureArrow right

Refrigerant Leak Check

Check mark

WARNING

Check mark

Ensure no mixing of refrigerants with air for leak testing.

Check mark

Leak Detection

Check mark

Use R-134a electronic leak detector for finding leaks.

Check mark

Test joints with soapsuds for large leaks.

Check mark

System Charging and Leak Check

Check mark

Charge the system with refrigerant to build up pressure between 2.1 to 3.5 kg/cm² (30 to 50 psig).

Check mark

Remove refrigerant cylinder.

Check mark

Leak-check all connections.

Run this procedureArrow right

Compressor Replacement

Check mark

Removal of Old Compressor

Check mark

Remove the protective guard from lower section of the unit.

Check mark

Remove all refrigerant using a refrigerant recovery system.

Check mark

Locate the compressor junction box and remove wiring.

Check mark

Disconnect wiring from compressor terminals and remove compressor junction box.

Check mark

Remove bolts from service valve flanges.

Check mark

Remove compressor plate mounting bolts.

Check mark

Remove compressor and mounting plate.

Check mark

Remove high pressure switch (HPS) from compressor and check operation of switch.

Run this procedureArrow right

Parts for Carrier Container Refrigeration Unit 69NT40-511-5

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Rupture Disc 1

14-00215-03

Rupture Disc 2

14-00215-04

Manifold Gauge

07-00294-00

Vacuum Pump

07-00176-01

Simpson Meter

07-00013

Rupture Disc 1

14-00215-03

Rupture Disc 2

14-00215-04

Manifold Gauge

07-00294-00

Vacuum Pump

07-00176-01

Simpson Meter

07-00013

Rupture Disc 1

14-00215-03

Rupture Disc 2

14-00215-04

Manifold Gauge

07-00294-00

Vacuum Pump

07-00176-01

Simpson Meter

07-00013

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Carrier

Explore Other Assets