Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Carrier Container Refrigeration Unit 69NT40-511-17
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Filter-Drier Replacement
Filter-Drier Replacement Process
Pump unit down to 0 psi
Replace filter-drier
Evacuate the unit as per section 6.5
Open the manual liquid line valve
Post Replacement Inspection
Is the unit in operation?
Inspect for moisture in system
High Pressure Switch Replacement
Preparation
Turn unit start-stop switch OFF
Frontseat both suction and discharge service valves to isolate compressor
Remove the refrigerant from the compressor
Switch Removal
Disconnect wiring from defective switch
Remove the high pressure switch by turning counterclockwise
Switch Installation
Verify switch settings before installation
Recording Thermometer Bulb Temperature Check
Preparation
Select the method for temperature stabilization
Unit Running Method
Set the unit's set point to 0°C (32°F)
Allow the unit to pull down to 0°C (32°F)
Enter the number of compressor ON-OFF cycles observed
Record the temperature indicated by the thermometer when the compressor cycles off
Does the temperature differ from 0°C (32°F) by more than 0.6°C (1°F)?
Unit Off Method
Suction Modulation Valve (SMV) Maintenance
Coil Checkout Procedure
Ensure power to the unit is OFF and power plug disconnected
Disconnect the suction modulation valve coil wires by unplugging the connector
Test each lead’s resistance to ground using a digital ohmmeter
Is there a ground short present?
Inspect the length of wiring for damaged or exposed wires and replace if necessary
Check coil’s resistance using a digital ohmmeter set to low range
Is the coil’s resistance below five ohms?
Plug in the connector for the modulation valve
Refrigerant Leak Check
Safety Precautions
WARNING
Ensure no mixing of refrigerants with air for leak testing.
Avoid exposing pressurized, air-rich mixtures of refrigerants to ignition sources.
Leak Detection
Use R-134a electronic leak detector for finding leaks.
Use soapsuds for locating large leaks only.
System Pressurization
Charge the system with refrigerant to build up pressure between 2.1 to 3.5 kg/cm² (30 to 50 psig).
Access the parts list for your equipment in MaintainX.
Rupture Disc 1
14-00215-03
Rupture Disc 2
14-00215-04
Manifold Gauge
07-00294-00
Vacuum Pump
07-00176-01
Simpson Meter
07-00013
Rupture Disc 1
14-00215-03
Rupture Disc 2
14-00215-04
Manifold Gauge
07-00294-00
Vacuum Pump
07-00176-01
Simpson Meter
07-00013
Rupture Disc 1
14-00215-03
Rupture Disc 2
14-00215-04
Manifold Gauge
07-00294-00
Vacuum Pump
07-00176-01
Simpson Meter
07-00013
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX