MaintainX Asset Hub logo
EnterprisePricing
Benson Heating

Benson Heating Gas Fired Room Sealed Unit Heater RS 200

Need answers fast?
Explore the manual using AI.

Benson Heating Gas Fired Room Sealed Unit Heater RS 200
Benson Heating Gas Fired Room Sealed Unit Heater RS 200

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Benson Heating Gas Fired Room Sealed Unit Heater RS 200

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Benson Heating Gas Fired Room Sealed Unit Heater RS 200

Benson Heating Gas Fired Room Sealed Unit Heater RS 200

Create an account to install this asset package.

Maintenance Plans for Benson Heating Gas Fired Room Sealed Unit Heater Model RS 200

Integrate maintenance plans directly into your work orders in MaintainX.

External Panels Cleaning

Check mark

Cleaning Process

Check mark

Use damp cloths with soap and water for cleaning

Check mark

Are there any stubborn stains?

Check mark

Dampen the cloth with a 50% mixture of water and white spirit for stubborn stains

Check mark

Dry the surfaces carefully after cleaning

Check mark

Clean filters regularly as required

Run this procedureArrow right

1 Yearly Heat Exchanger Inspection

Check mark

Pre-Inspection Notes

Check mark

Ensure routine inspections are carried out frequently and servicing is done regularly as per manufacturer's recommendations.

Check mark

Verify the need for increased frequency of servicing based on the working environment.

Check mark

Ensure a safe working platform with good access to the heater is available.

Check mark

Inspection and Cleaning

Check mark

Clean all accessible surfaces including the outside of the heat exchanger by removing the fan assembly and the louvres.

Check mark

Check for panel damage and that all fasteners are present and secure

Check mark

Visually check all electrical wiring for signs of damage

Check mark

Check all terminals are secure and free from escaped/stray conductor strands.

Run this procedureArrow right

Centrifugal Fan Maintenance

Check mark

Cleaning the Fan

Check mark

Remove dust from the fan wheel

Check mark

Remove foreign substances from the motor

Check mark

Clean the intake grate

Check mark

Transmission Belt Inspection

Check mark

Check the tension of the transmission belt

Check mark

Check the alignment between motor pulley and fan pulley

Check mark

Measure the belt deflection when pressed

Check mark

Use the belt-tightening system to adjust the transmission if necessary

Run this procedureArrow right

Initial Heater Check

Check mark

Pre-commissioning Checks

Check mark

Ensure all panels and fasteners are secure and in place

Check mark

Verify the heater is mounted safely

Check mark

Ensure the flue is sealed, secured, and adequately supported

Check mark

Check the fan and motor assembly

Check mark

Confirm the heater is not tilted and remains square

Check mark

Is the outlet duct resistance compatible with the data plate?

Check mark

Post-installation Checks

Check mark

Verify all safety conditions have been observed

Run this procedureArrow right

Injector Replacement

Check mark

Injector Removal and Replacement

Check mark

Unscrew the natural gas injectors

Check mark

Replace with the correct size injectors for propane

Check mark

Verify injector and nozzle specifications

Check mark

Place the transfer with the correct gas pressure onto the manifold as supplied in the conversion kit

Check mark

Post-Conversion Checks

Check mark

Test for gas soundness on completion

Check mark

Ensure new aluminium washers are fitted

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Benson Heating

Explore Other Assets