Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Benson Heating Gas Fired Room Sealed Unit Heater RS 80
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Heat Exchanger Inspection
Pre-Inspection Notes
Ensure routine inspections are carried out frequently and servicing is done regularly as per manufacturer's recommendations.
Verify that a safe working platform with good access to the heater is available.
Cleaning and Inspection
Clean all accessible surfaces including the outside of the heat exchanger by removing the fan assembly and the louvres.
Check for panel damage and ensure all fasteners are present and secure.
Visually inspect all electrical wiring for signs of damage, especially from contact with hot surfaces.
Check conduit for signs of chaffing and ensure it is secure.
Ensure all terminals are secure and free from escaped or stray conductor strands.
Heater Check
Initial Heater Startup
Start up the heater
Did the fan start approximately 30 seconds after ignition of the burner?
Full Efficiency Checks (After 20 minutes)
Check the fins and air flow
Are there any gas leaks?
Enter the gas rate using a meter
Enter the injector pressure
Enter the temperature rise and compare to data plate
Initial Heater Check
Pre-commissioning Checks
Ensure all panels and fasteners are secure and in place
Verify the heater is mounted safely
Ensure the flue is sealed, secured, and adequately supported
Check the fan and motor assembly
Confirm the heater is not tilted and remains square
Verify the outlet duct resistance is compatible with the data plate
Post-installation Checks
Ensure all safety conditions have been observed
External Panels Cleaning
Cleaning Process
Use damp cloths with soap and water for cleaning
Are there stubborn stains?
Dampen cloth with 50% mixture of water and white spirit for stubborn stains
Dry the surfaces carefully after cleaning
Filter Maintenance
Clean filters regularly as required
Injector Replacement
Injector Removal and Replacement
Unscrew the natural gas injectors
Replace with the correct size injectors for propane
Verify injector and nozzle specifications
Post-Conversion Tasks
Place the transfer with the correct gas pressure onto the manifold
Test for gas soundness
Ensure new aluminium washers are fitted
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX