Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Benson Heating Gas Fired Room Sealed Unit Heater RS 105
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Variable Pulley Maintenance
Belt Adjustment
Slacken the belt tension by unscrewing screw
Remove the belt
Pulley Adjustment
Loosen grub screw of the mobile part of pulley with a hexagonal spanner
Rotate the mobile part of the pulley to obtain the pitch line diameter required
Lock the grub screw tightly at the hub hollow
Belt Reinstallation
Mount and tighten the belt
External Panels Cleaning
Cleaning Process
Use damp cloths with soap and water for cleaning
Are there stubborn stains?
Dampen cloth with a 50% mixture of water and white spirit for stubborn stains
Dry the surfaces carefully after cleaning
Filter Maintenance
Clean filters regularly as required
1 Yearly Heat Exchanger Cleaning
Preparation
Ensure cleaning is performed by authorized personnel
Disconnect the gas solenoid valve unit
Disassembly
Remove burner from its housing
Remove upper panel
Remove inspection door
Remove conveyor
Cleaning
Initial Heater Check
Pre-commissioning Checks
Ensure all panels and fasteners are secure and in place
Verify the heater is mounted safely
Ensure the flue is sealed, secured, and adequately supported
Check the fan and its components
Confirm the heater is not tilted and remains square
Verify the outlet duct resistance is compatible with the data plate
Post-installation Checks
Confirm all safety conditions have been observed
1 Yearly Heat Exchanger Inspection
Pre-Inspection Notes
Ensure routine inspections are carried out frequently and servicing is done regularly as per manufacturer's recommendations.
Verify that a safe working platform with good access to the heater is available.
Cleaning and Inspection
Clean all accessible surfaces including the outside of the heat exchanger by removing the fan assembly and the louvres.
Check for panel damage and that all fasteners are present and secure
Visually check all electrical wiring for signs of damage
Check all terminals are secure and free from escaped/stray conductor strands.
Post-Inspection
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX