Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

A.O. Smith Copper Boiler DW-960
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Boiler Scale Removing
Preparation
Shut off electric and gas supply to the burner
Close gate valves 'A' and 'B'
Draining the Unit
Open drain cock and drain unit
Installation of Standpipe
Install standpipe in tee of inlet/outlet line
UN•LIME Treatment
Close drain cock
4 Monthly Circulating Pump Lubrication
Preparation
Ensure the circulating pump is properly sized for the application
Check water hardness, system pressure drop, and temperature rise across the boiler
Lubrication Process
Oil the three oil cups (2 on the motor, 1 on the pump) as instructed on the oil tube supplied with the unit
Add 2 or 3 teaspoonfuls of No. 20 non-detergent motor oil in bearing oil cups
Add 10 or 12 drops of No. 20 non-detergent motor oil in motor oil cups
Post-Lubrication Check
Is the lubrication process completed for all oil cups?
Boiler Cleaning
Pre-Cleaning Inspection
Ensure the boiler is turned off and cooled down
Is the area around the boiler free from lint and debris?
Cleaning Procedure
Sweep the floor around the boiler carefully to reduce dust and dirt
Check that the flow of combustion and ventilation air to the boiler is not obstructed
Safety Check
Is the boiler area clear and free from combustible materials, gasoline, and other flammable vapors and liquids?
Post-Cleaning Verification
Main Burners Cleaning
Preparation
Shut off all gas to the unit
Shut off all electric to the unit
Burner Tray Removal
Disconnect union assembly
Disconnect pilot line connection at main burner
Slide tray out of cabinet
Burner Cleaning
Remove main burners from unit
Heat Exchanger Deposits Removal
Preparation
Remove cover panel from far side of water connections
Inspection
Inspect to ensure tubes are free of scale and deposits
Cleaning
Are the tubes scaled?
Remove deposits with a stiff wire brush or mechanical tube cleaner to bare metal
Reassembly and Flushing
Install new 'O' rings
Access the parts list for your equipment in MaintainX.
UN•LIME(Deliming Solvent, 1 Gallon)
4763
UN•LIME(Deliming Solvent, 5 Gallons)
4813
Two Tank Manifold Kit
170354
Three Tank Manifold Kit
170355
Tank Fitting 2" (50 Mm)
94447
UN•LIME(Deliming Solvent, 1 Gallon)
4763
UN•LIME(Deliming Solvent, 5 Gallons)
4813
Two Tank Manifold Kit
170354
Three Tank Manifold Kit
170355
Tank Fitting 2" (50 Mm)
94447
UN•LIME(Deliming Solvent, 1 Gallon)
4763
UN•LIME(Deliming Solvent, 5 Gallons)
4813
Two Tank Manifold Kit
170354
Three Tank Manifold Kit
170355
Tank Fitting 2" (50 Mm)
94447
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX