MaintainX Asset Hub logo
EnterprisePricing
A.O. Smith

A.O. Smith Copper Boiler DW-1610

Need answers fast?
Explore the manual using AI.

A.O. Smith Copper Boiler DW-1610
A.O. Smith Copper Boiler DW-1610

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for A.O. Smith Copper Boiler DW-1610

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

A.O. Smith Copper Boiler DW-1610

A.O. Smith Copper Boiler DW-1610

Create an account to install this asset package.

Maintenance Plans for A.O. Smith Copper Boiler Model DW-1610

Integrate maintenance plans directly into your work orders in MaintainX.

Initial Circulating Pump Lubrication

Check mark

Pre-Lubrication Checks

Check mark

Verify water conditions

Check mark

Is the circulating pump properly sized for the application?

Check mark

Lubrication Process

Check mark

Oil the two motor oil cups as instructed on the oil tube

Check mark

Oil the pump oil cup as instructed on the oil tube

Check mark

Add 2 or 3 teaspoonfuls of No. 20 non-detergent motor oil in bearing oil cups

Check mark

Add 10 or 12 drops of No. 20 non-detergent motor oil in motor oil cups

Check mark

Post-Lubrication Checks

Run this procedureArrow right

6 Monthly Boiler Maintenance

Check mark

Safety Devices Inspection

Check mark

Inspect all safety devices including low water cutoffs for proper operation

Check mark

Low Water Cutoff Device Maintenance

Check mark

Flush the low water cutoff device of the float type

Check mark

Leak Inspection

Check mark

Check for leaks

Run this procedureArrow right

2 Monthly Boiler Deliming

Check mark

Preparation

Check mark

Ensure water softening equipment is operational

Check mark

Has the water temperature risen by approximately 5°F?

Check mark

Inspection

Check mark

Inspect the interior of the inlet/outlet manifold through the pressure relief valve tapping for lime build-up

Check mark

Deliming Process

Check mark

Obtain UN•LIME from dealer or distributor

Check mark

Read the instructions on the label of the UN•LIME container

Check mark

Ensure all valves, pipes, and fittings between gate valves 'A' and 'B' and the boiler are made of copper or brass

Run this procedureArrow right

Boiler Cleaning

Check mark

Pre-Cleaning Inspection

Check mark

Ensure the boiler is turned off and cooled down

Check mark

Is the area around the boiler free from lint and debris?

Check mark

Cleaning Process

Check mark

Sweep the floor around the boiler carefully to reduce dust and dirt

Check mark

Check that the flow of combustion and ventilation air to the boiler is not obstructed

Check mark

Post-Cleaning Inspection

Check mark

Is the boiler area clear and free from combustible materials, gasoline, and other flammable vapors and liquids?

Check mark

Technician's signature to confirm completion of cleaning

Run this procedureArrow right

6 Monthly Relief Valve Inspection

Check mark

Pre-Inspection Safety Measures

Check mark

Ensure drain line is installed to direct discharge to a safe location

Check mark

Is the manual gas control valve turned off?

Check mark

Relief Valve Operation Check

Check mark

Lift the lever at the top of the valve several times

Check mark

Does the valve seat properly and operate freely?

Check mark

Post-Inspection Safety Measures

Check mark

Check for any signs of overheating

Check mark

Is the gas supply functioning correctly?

Run this procedureArrow right

Parts for A.O. Smith Copper Boiler DW-1610

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

UN•LIME(Deliming Solvent, 1 Gallon)

4763

UN•LIME(Deliming Solvent, 5 Gallons)

4813

Two Tank Manifold Kit

170354

Three Tank Manifold Kit

170355

Tank Fitting 2" (50 Mm)

94447

UN•LIME(Deliming Solvent, 1 Gallon)

4763

UN•LIME(Deliming Solvent, 5 Gallons)

4813

Two Tank Manifold Kit

170354

Three Tank Manifold Kit

170355

Tank Fitting 2" (50 Mm)

94447

UN•LIME(Deliming Solvent, 1 Gallon)

4763

UN•LIME(Deliming Solvent, 5 Gallons)

4813

Two Tank Manifold Kit

170354

Three Tank Manifold Kit

170355

Tank Fitting 2" (50 Mm)

94447

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from A.O. Smith

Explore Other Assets