

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

A.O. Smith Copper Boiler DW-1480
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Main Burner Check
Main Burner Flame Characteristics
Check for complete combustion of gas
Ensure rapid ignition and carryover of flame across entire burner
Verify reasonably quiet operation during initial ignition, operation, and extinction
Check for no excessive lifting of flame from burner ports
Obstruction Check
Is there any accumulation of lint or foreign material restricting air openings?
Clear any lint or foreign material from air openings
Main Burners Cleaning
Preparation
Shut off all gas to the unit
Shut off all electric to the unit
Burner Tray Removal
Disconnect union assembly
Disconnect pilot line connection at main burner
Slide tray out of cabinet
Burner Cleaning
Remove main burners from unit
Boiler Systems Flushing
Preparation
Ensure the boiler is turned off and cooled down
Verify that all necessary tools and cleaning solutions are available
Initial Cleaning
Check for contaminants in the system
Add the recommended percentage of cleaning solution to the system
Flushing Process
Fire and circulate the system for about one hour
Flush the system clean with fresh water
Initial Circulating Pump Lubrication
Pre-Lubrication Checks
Verify water conditions
Is the circulating pump properly sized for the application?
Lubrication Process
Oil the three oil cups as instructed on the oil tube supplied with the unit
Add 2 or 3 teaspoonfuls of No. 20 non-detergent motor oil in bearing oil cups
Add 10 or 12 drops of No. 20 non-detergent motor oil in motor oil cups
Post-Lubrication Checks
Was the lubrication process completed successfully?
6 Monthly Boiler Maintenance
Safety Devices Inspection
Inspect all safety devices including low water cutoffs for proper operation
Low Water Cutoff Device Maintenance
Flush the low water cutoff device of the float type
Leak Inspection
Check for leaks
Access the parts list for your equipment in MaintainX.
UN•LIME(Deliming Solvent, 1 Gallon)
4763
UN•LIME(Deliming Solvent, 5 Gallons)
4813
Two Tank Manifold Kit
170354
Three Tank Manifold Kit
170355
Tank Fitting 2" (50 Mm)
94447
UN•LIME(Deliming Solvent, 1 Gallon)
4763
UN•LIME(Deliming Solvent, 5 Gallons)
4813
Two Tank Manifold Kit
170354
Three Tank Manifold Kit
170355
Tank Fitting 2" (50 Mm)
94447
UN•LIME(Deliming Solvent, 1 Gallon)
4763
UN•LIME(Deliming Solvent, 5 Gallons)
4813
Two Tank Manifold Kit
170354
Three Tank Manifold Kit
170355
Tank Fitting 2" (50 Mm)
94447
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













