MaintainX Asset Hub logo
EnterprisePricing
Antunes

Antunes Vertical Contact Toaster VCT-25 9200637

Need answers fast?
Explore the manual using AI.

Antunes Vertical Contact Toaster VCT-25 9200637
Antunes Vertical Contact Toaster VCT-25 9200637

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Antunes Vertical Contact Toaster VCT-25 9200637

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Antunes Vertical Contact Toaster VCT-25 9200637

Antunes Vertical Contact Toaster VCT-25 9200637

Create an account to install this asset package.

Maintenance Plans for Antunes Vertical Contact Toaster Model VCT-25 9200637

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Toaster Cleaning

Check mark

Safety Precautions

Check mark

Turn the power off and unplug the power cord.

Check mark

Allow the unit to cool down for 30 minutes.

Check mark

Cleaning the Release Sheet and Belt Wraps

Check mark

Clean the Release Sheet and Belt Wraps while they are warm.

Check mark

Disassembly and Cleaning

Check mark

Put on heat-resistant gloves.

Check mark

Remove the following components

Check mark

Wash the Butter Wheel, Pan, and Heat Shield in a sink.

Run this procedureArrow right

3 Monthly Belt Wraps Replacement

Check mark

Preparation

Check mark

Turn the power off and unplug the power cord.

Check mark

Allow the unit to cool.

Check mark

Disassembly

Check mark

Remove the following components

Check mark

Set the Bun Thickness Compression Knobs to 6 & 6.

Check mark

Belt Wrap Removal

Check mark

Open both Conveyor Covers.

Check mark

Pull the Belt Wrap Pin out of the zipper.

Run this procedureArrow right

4 Weekly Release Sheet Replacement

Check mark

Release Sheet Removal and Preparation

Check mark

Remove and discard the Release Sheet

Check mark

Lay a new Release Sheet on a clean, dry surface

Check mark

Fold the Release Sheet in half lengthwise and gently crease it at the fold using only your fingers

Check mark

Release Sheet Installation

Check mark

Install the Release Sheet as per the Daily Cleaning procedure

Run this procedureArrow right

Roler Tensioners Replacement

Check mark

Removing the Old Tensioner

Check mark

Push down on retaining tab of the tensioner

Check mark

Slide the tensioner out of the guide plate while keeping pressure on the retaining tab

Check mark

Installing the New Tensioner

Check mark

Slide the new tensioner into the retainer plate

Check mark

Post Replacement Check

Check mark

Is the new tensioner securely in place?

Check mark

Check for any unusual noises after replacement

Run this procedureArrow right

3 Monthly Roller Tensioners Check

Check mark

Measuring the Roller Tensioners

Check mark

Measure the Roller Tensioner on both inner Conveyor Covers using a U.S Nickel.

Check mark

Enter the measured space between the inner Conveyor Cover and bottom of the Tensioner wheel (in inches).

Check mark

Is the space 13/16” (2.1 cm) or the height of a U.S. Nickel?

Check mark

Adjust or replace any damaged Roller Tensioners as recommended.

Run this procedureArrow right

Parts for Antunes Vertical Contact Toaster VCT-25 9200637

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Power Cord, Harmonized 16A IEC 309

0700437

Thermostat, 530°F

4030235

Drive Sprocket

2150109

Drive Motor Kit, 120V (Incl. #58)

400K152

Drive Motor Kit, 230V (Incl. #58)

400K153

Power Cord, Harmonized 16A IEC 309

0700437

Thermostat, 530°F

4030235

Drive Sprocket

2150109

Drive Motor Kit, 120V (Incl. #58)

400K152

Drive Motor Kit, 230V (Incl. #58)

400K153

Power Cord, Harmonized 16A IEC 309

0700437

Thermostat, 530°F

4030235

Drive Sprocket

2150109

Drive Motor Kit, 120V (Incl. #58)

400K152

Drive Motor Kit, 230V (Incl. #58)

400K153

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Antunes

Explore Other Assets