MaintainX Asset Hub logo
EnterprisePricing
Antunes

Antunes Vertical Contact Toaster VCT-25 9200629

Need answers fast?
Explore the manual using AI.

Antunes Vertical Contact Toaster VCT-25 9200629
Antunes Vertical Contact Toaster VCT-25 9200629

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Antunes Vertical Contact Toaster VCT-25 9200629

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Antunes Vertical Contact Toaster VCT-25 9200629

Antunes Vertical Contact Toaster VCT-25 9200629

Create an account to install this asset package.

Maintenance Plans for Antunes Vertical Contact Toaster Model VCT-25 9200629

Integrate maintenance plans directly into your work orders in MaintainX.

4 Weekly Release Sheet Replacement

Check mark

Remove and discard the Release Sheet

Check mark

Prepare the new Release Sheet

Check mark

Lay a new Release Sheet on a clean, dry surface

Check mark

Fold the Release Sheet in half lengthwise and gently crease it at the fold using only your fingers

Check mark

Install the Release Sheet as after Daily Cleaning

Run this procedureArrow right

1 Daily Toaster Cleaning

Check mark

Safety Precautions

Check mark

Turn the power off and unplug the power cord.

Check mark

Allow the unit to cool down for 30 minutes.

Check mark

Cleaning Preparation

Check mark

Put on heat-resistant gloves.

Check mark

Remove components for cleaning

Check mark

Component Cleaning

Check mark

Wash the Butter Wheel, Pan, and Heat Shield in a sink.

Check mark

Wipe components with a damp sanitized towel and allow them to air dry.

Run this procedureArrow right

3 Monthly Conveyor Belt Chains Check

Check mark

Preparation

Check mark

Turn the unit off, unplug the power cord, and allow the unit to cool.

Check mark

Remove the Bun Feeder, Butter Wheel, Pan, and Heat Shield and set the Bun Thickness Compression Knobs to 6 & 6.

Check mark

Measuring Conveyor Belt Chains

Check mark

Open both Conveyor Covers and pull the Belt Wrap Pin out of the zipper.

Check mark

Remove the Belt Wrap.

Check mark

Locate the approximate center-point of the Conveyor Chain.

Check mark

Pull the Conveyor Chain away from the edge of the toaster.

Check mark

Stand a U.S. Dime on end between the frame and the chain.

Run this procedureArrow right

Conveyor Motor and Fan Blade Replacement

Check mark

Preparation

Check mark

Ensure availability of Loctite (Blue & Red) for gear motor installation.

Check mark

Motor and Bracket Removal

Check mark

Remove control cover.

Check mark

Disconnect the motor wires.

Check mark

Remove the drive motor and drive motor bracket.

Check mark

Discard the 8-32 x 5/16” mounting bracket screws.

Check mark

Sprocket and Bracket Removal

Check mark

Remove the motor sprocket using a hex wrench.

Run this procedureArrow right

Roler Tensioners Replacement

Check mark

Removing the Old Tensioner

Check mark

Push down on retaining tab of the tensioner

Check mark

Slide the tensioner out of the guide plate while keeping pressure on the retaining tab

Check mark

Installing the New Tensioner

Check mark

Slide the new tensioner into the retainer plate

Check mark

Post Replacement Check

Check mark

Is the new tensioner securely in place?

Check mark

Describe any issues encountered during replacement

Run this procedureArrow right

Parts for Antunes Vertical Contact Toaster VCT-25 9200629

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Power Cord/Plug, CEE 7/7

0700453

Drive Sprocket

2150109

Drive Motor Kit, 120V (Incl. #58)

400K152

Drive Motor Kit, 230V (Incl. #58)

400K153

Sprocket, Motor

2150110

Power Cord/Plug, CEE 7/7

0700453

Drive Sprocket

2150109

Drive Motor Kit, 120V (Incl. #58)

400K152

Drive Motor Kit, 230V (Incl. #58)

400K153

Sprocket, Motor

2150110

Power Cord/Plug, CEE 7/7

0700453

Drive Sprocket

2150109

Drive Motor Kit, 120V (Incl. #58)

400K152

Drive Motor Kit, 230V (Incl. #58)

400K153

Sprocket, Motor

2150110

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Antunes

Explore Other Assets