

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Antunes Vertical Contact Toaster VCT-25 9200640
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Roler Tensioners Replacement
Removing the Old Tensioner
Push down on retaining tab of the tensioner
Slide the tensioner out of the guide plate while keeping pressure on the retaining tab
Installing the New Tensioner
Slide the new tensioner into the retainer plate
Post Replacement Check
Is the new tensioner securely in place?
Check for any unusual noises after replacement
3 Monthly Roller Tensioners Check
Measuring the Roller Tensioners
Measure the Roller Tensioner on both inner Conveyor Covers using a U.S Nickel.
Enter the measured space between the inner Conveyor Cover and bottom of the Tensioner wheel (in cm).
Is the space 13/16” (2.1 cm) or the height of a U.S. Nickel?
Adjust or replace any damaged Roller Tensioners as recommended.
1 Daily Toaster Cleaning
Safety Precautions
Turn the power off and unplug the power cord.
Allow the unit to cool down for 30 minutes before performing any service or maintenance.
Cleaning the Release Sheet and Belt Wraps
Clean the Release Sheet and Belt Wraps while they are warm.
Removing Components
Put on heat-resistant gloves.
Remove the following components (if equipped):
Washing Components
3 Monthly Conveyor Belt Chains Check
Preparation
Turn the unit off, unplug the power cord, and allow the unit to cool.
Remove the Bun Feeder, Butter Wheel, Pan, and Heat Shield and set the Bun Thickness Compression Knobs to 6 & 6.
Measuring Conveyor Belt Chains
Open both Conveyor Covers and pull the Belt Wrap Pin out of the zipper.
Remove the Belt Wrap.
Locate the approximate center-point of the Conveyor Chain.
Pull the Conveyor Chain away from the edge of the toaster.
Stand a U.S. Dime on end between the frame and the chain.
4 Weekly Release Sheet Replacement
Release Sheet Removal and Preparation
Remove and discard the Release Sheet
Lay a new Release Sheet on a clean, dry surface
Fold the Release Sheet in half lengthwise and gently crease it at the fold using only your fingers
Install the Release Sheet as after Daily Cleaning
Access the parts list for your equipment in MaintainX.
Power Cord/Plug, CEE 7/7
0700453
Drive Sprocket
2150109
Drive Motor Kit, 120V (Incl. #58)
400K152
Drive Motor Kit, 230V (Incl. #58)
400K153
Sprocket, Motor
2150110
Power Cord/Plug, CEE 7/7
0700453
Drive Sprocket
2150109
Drive Motor Kit, 120V (Incl. #58)
400K152
Drive Motor Kit, 230V (Incl. #58)
400K153
Sprocket, Motor
2150110
Power Cord/Plug, CEE 7/7
0700453
Drive Sprocket
2150109
Drive Motor Kit, 120V (Incl. #58)
400K152
Drive Motor Kit, 230V (Incl. #58)
400K153
Sprocket, Motor
2150110
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













