

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Antunes Vertical Contact Toaster VCT-50 9200600
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Belt Wraps Replacement
Preparation
Turn the power off and unplug the power cord.
Allow the unit to cool.
Disassembly
Remove the following components
Set the Bun Thickness Compression Knobs to 6 & 6.
Belt Wrap Removal
Open both Conveyor Covers.
Pull the Belt Wrap Pin out of the zipper.
1 Daily Toaster Cleaning
Safety Precautions
Turn the power off and unplug the power cord.
Allow the unit to cool down for 30 minutes before performing any service or maintenance.
Cleaning the Release Sheet and Belt Wraps
Clean the Release Sheet and Belt Wraps while they are warm.
Removing Components
Put on heat-resistant gloves.
Remove the following components (if equipped):
Washing Components
Conveyor Motor and Fan Blade Replacement
Preparation
Ensure availability of Loctite (Blue & Red) for gear motor installation.
Motor and Bracket Removal
Remove control cover.
Disconnect the motor wires.
Remove the drive motor and drive motor bracket.
Discard the 8-32 x 5/16” mounting bracket screws.
Sprocket and Bracket Disassembly
Remove the motor sprocket using a hex wrench.
4 Weekly Release Sheet Replacement
Release Sheet Removal and Preparation
Remove and discard the Release Sheet
Lay a new Release Sheet on a clean, dry surface
Fold the Release Sheet in half lengthwise and gently crease it at the fold using only your fingers
Install the Release Sheet as after Daily Cleaning
3 Monthly Conveyor Belt Chains Check
Preparation
Turn the unit off and unplug the power cord
Allow the unit to cool
Initial Setup
Remove the following components
Set the Bun Thickness Compression Knobs to 6 & 6
Conveyor Belt Chain Measurement
Open both Conveyor Covers
Pull the Belt Wrap Pin out of the zipper
Access the parts list for your equipment in MaintainX.
Power Cord/Plug, NEMA 5-15P
0700463
Drive Sprocket
2150109
Drive Motor Kit, 120V (Incl. #58)
400K150
Drive Motor Kit, 230V (Incl. #58)
400K151
Sprocket, Motor
2150120
Power Cord/Plug, NEMA 5-15P
0700463
Drive Sprocket
2150109
Drive Motor Kit, 120V (Incl. #58)
400K150
Drive Motor Kit, 230V (Incl. #58)
400K151
Sprocket, Motor
2150120
Power Cord/Plug, NEMA 5-15P
0700463
Drive Sprocket
2150109
Drive Motor Kit, 120V (Incl. #58)
400K150
Drive Motor Kit, 230V (Incl. #58)
400K151
Sprocket, Motor
2150120
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













