Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Antunes Vertical Contact Toaster VCT-50 9200606
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Roller Tensioners Check
Measuring the Roller Tensioners
Measure the Roller Tensioner on both inner Conveyor Covers using a U.S Nickel.
Record the space between the inner Conveyor Cover and bottom of the Tensioner wheel in inches.
Is the space between the inner Conveyor Cover and bottom of the Tensioner wheel 13/16” (2.1 cm)?
Adjust or replace any damaged Roller Tensioners as recommended.
Conveyor Motor and Fan Blade Replacement
Preparation
Ensure availability of Loctite (Blue & Red) for gear motor installation.
Motor and Bracket Removal
Remove control cover.
Disconnect the motor wires.
Remove the drive motor and drive motor bracket.
Discard the 8-32 x 5/16” mounting bracket screws.
Sprocket and Bracket Disassembly
Remove the motor sprocket using a hex wrench.
1 Daily Toaster Cleaning
Safety Precautions
Turn the power off and unplug the power cord.
Allow the unit to cool down for 30 minutes.
Cleaning the Release Sheet and Belt Wraps
Clean the Release Sheet and Belt Wraps while they are warm.
Removing Components
Put on heat-resistant gloves.
Remove the following components
Washing Components
3 Monthly Belt Wraps Replacement
Preparation
Turn the power off and unplug the power cord.
Allow the unit to cool.
Disassembly
Remove the Bun Feeder.
Remove the Butter Wheel.
Remove the Pan.
Remove the Heat Shield.
Set the Bun Thickness Compression Knobs to 6 & 6.
4 Weekly Release Sheet Replacement
Release Sheet Removal
Remove and discard the Release Sheet
Preparation of New Release Sheet
Lay a new Release Sheet on a clean, dry surface
Fold the Release Sheet in half lengthwise and gently crease it at the fold using only your fingers
Installation of New Release Sheet
Install the Release Sheet as after Daily Cleaning
Access the parts list for your equipment in MaintainX.
Power Cord/Plug, NEMA 6-20P
0700452
Thermostat, 530°F
4030235
Drive Sprocket
2150109
Drive Motor Kit, 120V (Incl. #58)
400K150
Drive Motor Kit, 230V (Incl. #58)
400K151
Power Cord/Plug, NEMA 6-20P
0700452
Thermostat, 530°F
4030235
Drive Sprocket
2150109
Drive Motor Kit, 120V (Incl. #58)
400K150
Drive Motor Kit, 230V (Incl. #58)
400K151
Power Cord/Plug, NEMA 6-20P
0700452
Thermostat, 530°F
4030235
Drive Sprocket
2150109
Drive Motor Kit, 120V (Incl. #58)
400K150
Drive Motor Kit, 230V (Incl. #58)
400K151
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX