

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advanced Distributor Products Unit Heater SEP-400-A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
2 Yearly Motor Bearing Lubrication
Combustion Air Inducer Motor Bearings
Verify that combustion air inducer motor bearings are pre-lubricated and sealed
Fan Motor Bearings
Are manufacturer’s instructions available for fan motor bearing lubrication?
If manufacturer's instructions are available
Lubricate fan motor bearings according to manufacturer's instructions
If manufacturer's instructions are not available
Check if fan motors have oiling ports
Are the fan motors pre-lubricated for extended bearing life?
Safety Shut-Off Valve Inspection
Initial Setup
Turn off the manual gas valve
Set the thermostat to call for heat
System Operation Check
Did the system begin normal sequence of operation?
Wait for approximately 30 seconds (pre purge period)
Is the LED fast flashing indicating the gas valve is powered?
Gas Valve Cycling
Wait for 10 seconds for the gas valve to close
Gas Pressure Adjustment
Gas Line Pressure Check
Enter the gas line pressure with unit firing at maximum rate
Regulator Pressure Adjustment
Has the line pressure been checked and adjusted?
Enter the adjusted manifold pressure
Verify gas pressure adjustment screw location
Conversion Procedure
Is a natural gas to LP/propane gas changeover kit required?
Refer to installation instructions provided with changeover kit for conversion procedure
Combustion Air Inducer Check
Preparation
Disconnect power supply
Inspection and Cleaning
Inspect the combustion air inducer for any visible damage or wear
Clean the inducer wheel using a small brush
Post-Inspection
Is the combustion air inducer free of debris and damage?
Burner Maintenance
Burner Flame Examination
Examine burner flames for proper appearance during the heating season
Pre-Heating Season Inspection
Examine burners for any deposits or blockage
Burner Cleaning Procedure
Turn off both electrical and gas supplies to unit
Disconnect gas supply piping, high tension and sensor leads
Remove gas manifold
Remove burner tray
Access the parts list for your equipment in MaintainX.
Hanging Bracket Kit
100001381
LPG/Propane Kit
165295206
6” Straight Pipe (Length = 12”)
66809501
6” Straight Pipe (Length = 36”)
66809502
Hanging Bracket Kit
100001381
LPG/Propane Kit
165295206
6” Straight Pipe (Length = 12”)
66809501
6” Straight Pipe (Length = 36”)
66809502
Hanging Bracket Kit
100001381
LPG/Propane Kit
165295206
6” Straight Pipe (Length = 12”)
66809501
6” Straight Pipe (Length = 36”)
66809502
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













