MaintainX Asset Hub logo
EnterprisePricing
Adolf Mohr Maschinenfabrik

Adolf Mohr Maschinenfabrik High-Speed Paper Cutter 115 ED

Need answers fast?
Explore the manual using AI.

Adolf Mohr Maschinenfabrik High-Speed Paper Cutter 115 ED
Adolf Mohr Maschinenfabrik High-Speed Paper Cutter 115 ED

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Adolf Mohr Maschinenfabrik High-Speed Paper Cutter 115 ED

Adolf Mohr Maschinenfabrik High-Speed Paper Cutter 115 ED

Create an account to install this asset package.

Maintenance Plans for Adolf Mohr Maschinenfabrik High-Speed Paper Cutter Model 115 ED

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 500 Hours Gear Oil Change

Check mark

Preparation

Check mark

Ensure the machine is turned off and cooled down

Check mark

Gather necessary tools and equipment

Check mark

Oil Draining

Check mark

Check for any leaks around the oil drain plug

Check mark

Place an oil pan under the drain plug

Check mark

Carefully remove the oil drain plug to bleed hot oil

Check mark

Oil Filling

Check mark

Replace and tighten the oil drain plug

Run this procedureArrow right

6000 Hourly Hydraulic Oil Change

Check mark

Warning: Attention when bleeding hot oil - danger of burning!

Check mark

Preparation

Check mark

Ensure the machine is turned off and cooled down

Check mark

Gather necessary tools and equipment

Check mark

Oil Change Procedure

Check mark

Locate the hydraulic unit inside the right frame pillar

Check mark

Place a container to collect old oil

Check mark

Bleed the hot oil carefully to avoid burns

Check mark

Dispose of the old oil according to environmental regulations

Run this procedureArrow right

Backgauge Guide Rails Lubrication

Check mark

BACKGAUGE GUIDE RAILS (only 78, 92, 115, 137, 155)

Check mark

Lubrication Process

Check mark

Ensure the machine is turned off and secured

Check mark

Select the guide rail size

Check mark

Locate the 2 lubricating nipples on the backgauge

Check mark

Enter the number of strokes used with the grease gun

Check mark

Was the lubrication completed successfully?

Check mark

Post Lubrication

Check mark

Clean any excess grease from the area

Run this procedureArrow right

6000 Hourly Oil Filter Cleaning

Check mark

Warning: Attention when bleeding hot oil - danger of burning!

Check mark

Preparation

Check mark

Ensure hydraulic unit is mounted inside right frame pillar

Check mark

Record the current operating hours of the machine

Check mark

Oil Change

Check mark

Has the oil been changed within the last 6000 hours?

Check mark

Change the oil if it has not been changed within the last 6000 hours

Check mark

Oil Filter Cleaning

Check mark

Clean the oil filter

Run this procedureArrow right

Machine Lubrication

Check mark

Lubrication Preparation

Check mark

Ensure the machine is turned off and cooled down

Check mark

Gather necessary tools and materials (grease gun, grease)

Check mark

Lubrication Process

Check mark

Identify lubrication points

Check mark

Apply 2-3 strokes of grease to each lubrication point

Check mark

Post-Lubrication Check

Check mark

Is there any excess grease that needs to be wiped off?

Check mark

Clean the grease gun and store it properly

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Adolf Mohr Maschinenfabrik

Explore Other Assets