Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Adolf Mohr Maschinenfabrik High-Speed Paper Cutter 115 ED
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 500 Hours Gear Oil Change
Preparation
Ensure the machine is turned off and cooled down
Gather necessary tools and equipment
Oil Draining
Check for any leaks around the oil drain plug
Place an oil pan under the drain plug
Carefully remove the oil drain plug to bleed hot oil
Oil Filling
Replace and tighten the oil drain plug
6000 Hourly Hydraulic Oil Change
Warning: Attention when bleeding hot oil - danger of burning!
Preparation
Ensure the machine is turned off and cooled down
Gather necessary tools and equipment
Oil Change Procedure
Locate the hydraulic unit inside the right frame pillar
Place a container to collect old oil
Bleed the hot oil carefully to avoid burns
Dispose of the old oil according to environmental regulations
Backgauge Guide Rails Lubrication
BACKGAUGE GUIDE RAILS (only 78, 92, 115, 137, 155)
Lubrication Process
Ensure the machine is turned off and secured
Select the guide rail size
Locate the 2 lubricating nipples on the backgauge
Enter the number of strokes used with the grease gun
Was the lubrication completed successfully?
Post Lubrication
Clean any excess grease from the area
6000 Hourly Oil Filter Cleaning
Warning: Attention when bleeding hot oil - danger of burning!
Preparation
Ensure hydraulic unit is mounted inside right frame pillar
Record the current operating hours of the machine
Oil Change
Has the oil been changed within the last 6000 hours?
Change the oil if it has not been changed within the last 6000 hours
Oil Filter Cleaning
Clean the oil filter
Machine Lubrication
Lubrication Preparation
Ensure the machine is turned off and cooled down
Gather necessary tools and materials (grease gun, grease)
Lubrication Process
Identify lubrication points
Apply 2-3 strokes of grease to each lubrication point
Post-Lubrication Check
Is there any excess grease that needs to be wiped off?
Clean the grease gun and store it properly
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













