

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Nidec Electric Motor DY80
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
2 Yearly Low Speed Bearing Lubrication
Grease Lubrication Instructions
Verify applicable bearing types and sizes
Ensure motor is at rest and electrical controls are locked open
Remove the drain plug
Inspect grease drain and remove any blockage with a mechanical probe
Add new grease at the grease inlet according to Table 1
Is the new grease compatible with the existing grease in the motor?
Run the motor for 15 to 30 minutes with the drain plug removed
Shut off unit and replace the drain plug
3 Monthly Ball Bearing Lubrication
Grease Lubrication Instructions
Verify applicable bearing types and RPM range
Ensure motor is at rest and electrical controls are locked open
Remove the drain plug
Inspect grease drain and remove any blockage with a mechanical probe
Add new grease at the grease inlet
Is the new grease compatible with the existing grease in the motor?
Run the motor for 15 to 30 minutes with the drain plug removed
Shut off unit and replace the drain plug
2 Yearly Ball Bearing Lubrication
Grease Lubrication Instructions
Verify applicable conditions for lubrication
Ensure motor is at rest and electrical controls are locked open
Remove the drain plug
Inspect grease drain and remove any blockage with a mechanical probe
Add new grease at the grease inlet
Is the new grease compatible with the existing grease in the motor?
Run the motor for 15 to 30 minutes with the drain plug removed
Shut off unit and replace the drain plug
Motor Inspection
Maintenance
Inspect units at regular intervals
Keep units clean and ventilation openings clear of dust, dirt or other debris
Lubricate units as per instructions
Ensure no excessive lubrication
Safety Precautions
Disconnect all power sources
Discharge all parts retaining electrical charge
Maintain screen and covers in place during operation
6 Monthly Ball Bearing Lubrication
Grease Lubrication Instructions
Identify applicable bearings and grease quantities
Ensure motor is at rest and electrical controls are locked open
Remove the drain plug
Inspect grease drain and remove any blockage with a mechanical probe
Add new grease at the grease inlet
Run the motor for 15 to 30 minutes with the drain plug removed
Shut off unit and replace the drain plug
Return motor to service
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













