Aaon Packaged Rooftop Unit RNA-020-C-0-3-FAAB-00A

Need answers fast?
Explore the manual using AI.

Aaon Packaged Rooftop Unit RNA-020-C-0-3-FAAB-00A
Aaon Packaged Rooftop Unit RNA-020-C-0-3-FAAB-00A

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Aaon Packaged Rooftop Unit RNA-020-C-0-3-FAAB-00A

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Aaon Packaged Rooftop Unit RNA-020-C-0-3-FAAB-00A

Aaon Packaged Rooftop Unit RNA-020-C-0-3-FAAB-00A

Create an account to install this asset package.

Maintenance Plans for Aaon Packaged Rooftop Unit Model RNA-020-C-0-3-FAAB-00A

Integrate maintenance plans directly into your work orders in MaintainX.

Fan Maintenance

Check mark

Safety Precautions

Check mark

Shut off all electrical power to the unit to avoid shock hazard or injury from rotating parts

Check mark

Inspection and Cleaning

Check mark

Inspect blower wheels and bands for excessive dust build up

Check mark

Is there excessive dust build up on blower wheels?

Check mark

Clean blower wheels if excessive dust build up is found

Check mark

Post Maintenance

Check mark

Check for any signs of vibration or component failure after cleaning

Check mark

Ensure all components are securely fastened after maintenance

Run this procedureArrow right

Polymer Wheel Drive Motor And Pulley Replacement

Check mark

Preparation

Check mark

Disconnect power to wheel drive motor

Check mark

Removal of Old Components

Check mark

Remove belt from pulley and position temporarily around wheel rim

Check mark

Loosen set screw in wheel drive pulley using a hex head wrench

Check mark

Remove pulley from motor drive shaft

Check mark

While supporting weight of drive motor, loosen and remove (4) mounting bolts

Check mark

Installation of New Components

Check mark

Install replacement motor with hardware kit supplied

Run this procedureArrow right

4 Yearly Energy Recovery Wheel Cleaning

Check mark

Class 2: Moderately Clean Air

Check mark

Examples of areas with moderately clean air

Check mark

Cleaning Frequency (years)

Check mark

Pre-Cleaning Inspection

Check mark

Inspect the energy recovery wheel for visible dirt and debris

Check mark

Is there any visible damage to the wheel?

Check mark

Cleaning Process

Check mark

Clean the wheel using appropriate cleaning agents

Check mark

Was the wheel dried properly after cleaning?

Run this procedureArrow right

1 Yearly Aluminum Wheel Purge Sector Inspection

Check mark

Inspection of Purge Sector Condition

Check mark

Check the condition of the purge sector

Check mark

Verify the rigidness of the purge sector

Check mark

Cleanliness Check

Check mark

Inspect the cleanliness of the purge sector

Check mark

Is cleaning required?

Check mark

Use compressed air to clean the purge sector if required

Check mark

Distance Verification

Check mark

Measure the distance of the sector against the recovery wheel matrix

Run this procedureArrow right

1 Yearly Microchannel Condenser Coil Cleaning

Check mark

Preparation

Check mark

Ensure the unit is turned off before starting

Check mark

Shut off all electrical power to the unit to avoid shock hazard or injury from rotating parts

Check mark

Cleaning Procedure

Check mark

Select the appropriate chemical cleaner

Check mark

Ensure water pressure does not exceed 689.5 kpa (100 psi)

Check mark

Maintain a minimum distance of 15.25 centimeters (6 inches) from the coils while cleaning

Check mark

Aim water perpendicular to the coils during cleaning

Check mark

E-Coated Coil Cleaning

Run this procedureArrow right

Parts for Aaon Packaged Rooftop Unit RNA-020-C-0-3-FAAB-00A

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Simple Green

T10701

Lamp

R68860

Simple Green

T10701

Lamp

R68860

Simple Green

T10701

Lamp

R68860

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.