

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Aaon Packaged Rooftop Unit RNA-020-C-0-3-FAAB-00A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Fan Maintenance
Safety Precautions
Shut off all electrical power to the unit to avoid shock hazard or injury from rotating parts
Inspection and Cleaning
Inspect blower wheels and bands for excessive dust build up
Is there excessive dust build up on blower wheels?
Clean blower wheels if excessive dust build up is found
Post Maintenance
Check for any signs of vibration or component failure after cleaning
Ensure all components are securely fastened after maintenance
Polymer Wheel Drive Motor And Pulley Replacement
Preparation
Disconnect power to wheel drive motor
Removal of Old Components
Remove belt from pulley and position temporarily around wheel rim
Loosen set screw in wheel drive pulley using a hex head wrench
Remove pulley from motor drive shaft
While supporting weight of drive motor, loosen and remove (4) mounting bolts
Installation of New Components
Install replacement motor with hardware kit supplied
4 Yearly Energy Recovery Wheel Cleaning
Class 2: Moderately Clean Air
Examples of areas with moderately clean air
Cleaning Frequency (years)
Pre-Cleaning Inspection
Inspect the energy recovery wheel for visible dirt and debris
Is there any visible damage to the wheel?
Cleaning Process
Clean the wheel using appropriate cleaning agents
Was the wheel dried properly after cleaning?
1 Yearly Aluminum Wheel Purge Sector Inspection
Inspection of Purge Sector Condition
Check the condition of the purge sector
Verify the rigidness of the purge sector
Cleanliness Check
Inspect the cleanliness of the purge sector
Is cleaning required?
Use compressed air to clean the purge sector if required
Distance Verification
Measure the distance of the sector against the recovery wheel matrix
1 Yearly Microchannel Condenser Coil Cleaning
Preparation
Ensure the unit is turned off before starting
Shut off all electrical power to the unit to avoid shock hazard or injury from rotating parts
Cleaning Procedure
Select the appropriate chemical cleaner
Ensure water pressure does not exceed 689.5 kpa (100 psi)
Maintain a minimum distance of 15.25 centimeters (6 inches) from the coils while cleaning
Aim water perpendicular to the coils during cleaning
E-Coated Coil Cleaning
Access the parts list for your equipment in MaintainX.
Simple Green
T10701
Lamp
R68860
Simple Green
T10701
Lamp
R68860
Simple Green
T10701
Lamp
R68860
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













