Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Xylem Heavy-Duty Submersible Mixer SR4650.31
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Propeller Change
Safety Precautions
Wear protective clothing
Tools Required
Ensure the following tools are available
Remove the Propeller
Twist off the propeller plug and the O-ring
Loosen the hub screw using an M12 hexagon bit adapter (part no 84 14 79), n=10
Remove the propeller
Remove the shaft key, handling it by its ends
Oil Change
Drain the oil
Lay the mixer on two supports or suspend the mixer horizontally from an overhead crane.
Place a vessel under the mixer to hold the oil being drained.
Remove the drain plug and the filling plug to facilitate oil drainage.
Re-position the O-ring and the drain plug after oil has been drained.
Tighten the drain plug to the specified torque (10-20 Nm or 7.4-14.8 ft-lbs).
Fill the oil
Select the mixer working position and fill the required oil quantity
Fill with new oil through the appropriate hole based on mixer position.
Initial 1 Year Mixer Inspection
Safety Precautions
Disconnect and lock out power before servicing
Ensure only certified electricians and Xylem-authorized mechanics perform maintenance on EN/ATEX or FM-approved mixers
Pre-Inspection Requirements
Verify the following requirements are met
Inspection and Maintenance
Conduct a check-up by an authorized Xylem service representative
Document findings and determine intervals for periodical inspection and major overhaul
12000 Hourly/3 Yearly Mixer Inspection
Safety Precautions
Disconnect and lock out power before servicing
Is the mixer EN/ATEX or FM-approved?
If EN/ATEX or FM-approved, ensure only certified electricians and Xylem-authorized mechanics perform maintenance
Pre-Inspection Requirements
Ensure the following requirements are met
Inspection and Maintenance
Perform general inspection of the mixer
Control and replace wear parts as necessary
Mixer Inspection
Cable Inspection
Is the outer jacket of the cable damaged?
Replace the cable if the outer jacket is damaged.
Check that the cables do not have any sharp bends and are not pinched.
Check that the connections to power are properly tightened.
Check that the electrical cabinets are clean and dry.
Insulation Check
Measure the resistance between the earth (ground) and phase lead. Should be more than 5 megohms.
Conduct a phase-to-phase resistance check.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX